PRISM: From Feasible Geometry to Routing Capacity in Learning to Optimize
Keep the title, authors and abstract in paper.json
potentialpaper · 2026-11-23 19:06 UTC · 4d9845e71c7b ·
.potentialpaper/metadata.json modified
+++ b/.potentialpaper/metadata.json@@ -1,19 +1,5 @@{- "layout": 5,- "identifiers": [- {- "scheme": "openreview",- "value": "2Or16EqHj8"- }- ],- "title": "PRISM: From Feasible Geometry to Routing Capacity in Learning to Optimize",- "authors": [],- "abstract": "Many learning-to-optimize methods struggle once the constraint set is curved, non-convex or disconnected: they either cannot guarantee hard feasibility there or lose solution quality. Feasibility alone is also not enough: a parametrisation can be feasible everywhere yet unable to represent the solution it is trained toward, and then no training closes the gap. For ray parametrisations, which place the output on a ray from an interior anchor, reachability is set by two budgets, anchors A and feasible segments K per ray: with one anchor and one segment, a second component or the far side of a hole is out of reach; each set admits a region of sufficient (A,K) budgets, and some are provably insufficient. PRISM realises such budgets: one shared network proposes ray candidates from an anchor bank, a parameter-free oracle marks each ray's feasible segments, and with valid anchors and an exact or certified oracle every hard-routed output is feasible. A measurement pass reads a data-supported (A,K) configuration off the feasible training labels and certifies its held-out coverage, without claiming the smallest budget. Under stated regularity assumptions we prove compact-set approximation, single-anchor obstructions, and a coverage-to-gap existence bound. On ten non-convex geometries the measured budgets cover at least 98\\% of held-out targets while single-anchor controls are starved on every disconnected set; on fifteen parametric problems PRISM meets each row's feasibility criterion and is best on twelve (the three legacy AC optimal power flow rows are coordinate-surrogate, box-only-residual evidence, not full-AC feasibility); on case30, conditional on a certified initial root, each accepted update certifies a continuous, strictly feasible root path with exact cost decrease.",- "year": 2027,- "venue": "ICLR 2027 (under review)",- "source": "openreview",- "license": {- "metadata": "CC0-1.0",- "abstract": "CC0-1.0"- }+ "layout": 6,+ "kind": "paper",+ "key": "9836a7ee-5c51-486b-8ee4-e5a9f0115469"}
paper.json added
+++ b/paper.json@@ -0,0 +1,9 @@+{+ "title": "PRISM: From Feasible Geometry to Routing Capacity in Learning to Optimize",+ "authors": [],+ "abstract": "Many learning-to-optimize methods struggle once the constraint set is curved, non-convex or disconnected: they either cannot guarantee hard feasibility there or lose solution quality. Feasibility alone is also not enough: a parametrisation can be feasible everywhere yet unable to represent the solution it is trained toward, and then no training closes the gap. For ray parametrisations, which place the output on a ray from an interior anchor, reachability is set by two budgets, anchors A and feasible segments K per ray: with one anchor and one segment, a second component or the far side of a hole is out of reach; each set admits a region of sufficient (A,K) budgets, and some are provably insufficient. PRISM realises such budgets: one shared network proposes ray candidates from an anchor bank, a parameter-free oracle marks each ray's feasible segments, and with valid anchors and an exact or certified oracle every hard-routed output is feasible. A measurement pass reads a data-supported (A,K) configuration off the feasible training labels and certifies its held-out coverage, without claiming the smallest budget. Under stated regularity assumptions we prove compact-set approximation, single-anchor obstructions, and a coverage-to-gap existence bound. On ten non-convex geometries the measured budgets cover at least 98\\% of held-out targets while single-anchor controls are starved on every disconnected set; on fifteen parametric problems PRISM meets each row's feasibility criterion and is best on twelve (the three legacy AC optimal power flow rows are coordinate-surrogate, box-only-residual evidence, not full-AC feasibility); on case30, conditional on a certified initial root, each accepted update certifies a continuous, strictly feasible root path with exact cost decrease.",+ "license": {+ "metadata": "CC0-1.0",+ "abstract": "CC0-1.0"+ }+}