potentialpaper

TRAP: Auditing Target Risk After Prompt-Side Acceptance

Keep the title, authors and abstract in paper.json

potentialpaper · 2026-11-23 19:45 UTC · abad27cb1f0b ·

.potentialpaper/metadata.json modified

+++ b/.potentialpaper/metadata.json
@@ -1,19 +1,5 @@
{
- "layout": 5,
- "identifiers": [
- {
- "scheme": "openreview",
- "value": "cFDmNNiNvp"
- }
- ],
- "title": "TRAP: Auditing Target Risk After Prompt-Side Acceptance",
- "authors": [],
- "abstract": "Prompt-side acceptance is decided before a response exists, but downstream harm also depends on the model that answers. We test whether the downstream risk meaning of a frozen prompt-side release decision survives response-target substitution. A prospective recovery policy releases the same 109 of 150 source-unsafe OR-Bench prompts to four targets, including a base-model stress target. Harmful-release mass ranges from 0.67% to 64.00%; the Mistral versus Qwen2.5 gap is 26.0 percentage points, corroborated by independent grading and a blinded human audit. A distinct direct-screen policy replicates target dependence on 1,000 sealed unsafe prompts, with a prespecified 24.3-point Ministral versus gpt-oss gap (97.5% CI [20.4,28.2]). Modern targets under the recovery policy vary less. To test the boundary of this result, we identify an input-guard policy that satisfies a prespecified Qwen3 risk-coverage contract using guards disjoint from the response evaluators. On a separate sealed population of 2,000 unsafe and 150 legitimate prompts, harmful-release mass is at most 1.10% for Qwen3 and Gemma-3 under each evaluator. Under Gemma-3 substitution, neither the predeclared 5% risk-violation criterion nor the three-point paired-margin criterion is met. Target dependence therefore need not violate a qualified contract; downstream assurance requires validation under the declared deployment contract.",
- "year": 2027,
- "venue": "ICLR 2027 (under review)",
- "source": "openreview",
- "license": {
- "metadata": "CC0-1.0",
- "abstract": "CC0-1.0"
- }
+ "layout": 6,
+ "kind": "paper",
+ "key": "16fe7e9a-ece6-4f2c-ba6b-e93743cd9131"
}

paper.json added

+++ b/paper.json
@@ -0,0 +1,9 @@
+{
+ "title": "TRAP: Auditing Target Risk After Prompt-Side Acceptance",
+ "authors": [],
+ "abstract": "Prompt-side acceptance is decided before a response exists, but downstream harm also depends on the model that answers. We test whether the downstream risk meaning of a frozen prompt-side release decision survives response-target substitution. A prospective recovery policy releases the same 109 of 150 source-unsafe OR-Bench prompts to four targets, including a base-model stress target. Harmful-release mass ranges from 0.67% to 64.00%; the Mistral versus Qwen2.5 gap is 26.0 percentage points, corroborated by independent grading and a blinded human audit. A distinct direct-screen policy replicates target dependence on 1,000 sealed unsafe prompts, with a prespecified 24.3-point Ministral versus gpt-oss gap (97.5% CI [20.4,28.2]). Modern targets under the recovery policy vary less. To test the boundary of this result, we identify an input-guard policy that satisfies a prespecified Qwen3 risk-coverage contract using guards disjoint from the response evaluators. On a separate sealed population of 2,000 unsafe and 150 legitimate prompts, harmful-release mass is at most 1.10% for Qwen3 and Gemma-3 under each evaluator. Under Gemma-3 substitution, neither the predeclared 5% risk-violation criterion nor the three-point paired-margin criterion is met. Target dependence therefore need not violate a qualified contract; downstream assurance requires validation under the declared deployment contract.",
+ "license": {
+ "metadata": "CC0-1.0",
+ "abstract": "CC0-1.0"
+ }
+}