potentialpaper

Half the Rollouts, No Measurable Cost: A Seeded Audit of Dynamic Sampling and Credit Assignment in DAPO

Keep the title, authors and abstract in paper.json

potentialpaper · 2026-11-23 20:14 UTC · f54e4b406f00 ·

.potentialpaper/metadata.json modified

+++ b/.potentialpaper/metadata.json
@@ -1,19 +1,5 @@
{
- "layout": 5,
- "identifiers": [
- {
- "scheme": "openreview",
- "value": "YUmDE8Psy6"
- }
- ],
- "title": "Half the Rollouts, No Measurable Cost: A Seeded Audit of Dynamic Sampling and Credit Assignment in DAPO",
- "authors": [],
- "abstract": "Reinforcement learning for mathematical reasoning is routinely evaluated on AIME, where a single problem is worth over three points, and improvements of one to two points are commonly reported from a single training run. We ask whether such improvements are measurable, and answer with a pre-registered, seeded audit of DAPO on Qwen2.5-Math-7B. Three seeds of the unmodified baseline, read out at 128 samples per problem on AIME 2024 and 2025 pooled, span 1.96 points with a standard deviation of 0.99; across thirteen single-seed runs the rank correlation between the two AIME years is −0.03. Against that unit, we built nine variants: token-level credit-assignment methods that reweight advantages by pivotality, add contrastive step rewards, or importance-weight positions by future influence, and a prompt selector driven by a tracked difficulty estimate; none is individually distinguishable from the baseline under its three-seed prediction interval, and the modified-recipe runs sit on average about 1.5 points below it. A KL-targeted step-size controller, holding each variant at the baseline's late-phase KL, does not recover the largest harm, from high-amplification reweighting. The positive finding concerns the rollout budget: the 75% of prompts that DAPO's dynamic sampling discards are mostly surplus truncated once the training batch is filled; under a trained policy the mixed-group rate is 60–76%, far above the 25% implied by the discard statistic. Halving the generation batch trains the same 64 groups per step at half the rollouts and 24% less wall-clock, with a pooled accuracy difference of −0.18 points over three seeds each, inside the seed standard deviation on both sides.",
- "year": 2027,
- "venue": "ICLR 2027 (under review)",
- "source": "openreview",
- "license": {
- "metadata": "CC0-1.0",
- "abstract": "CC0-1.0"
- }
+ "layout": 6,
+ "kind": "paper",
+ "key": "30306f28-0d07-4240-9126-6320f1ecd12b"
}

paper.json added

+++ b/paper.json
@@ -0,0 +1,9 @@
+{
+ "title": "Half the Rollouts, No Measurable Cost: A Seeded Audit of Dynamic Sampling and Credit Assignment in DAPO",
+ "authors": [],
+ "abstract": "Reinforcement learning for mathematical reasoning is routinely evaluated on AIME, where a single problem is worth over three points, and improvements of one to two points are commonly reported from a single training run. We ask whether such improvements are measurable, and answer with a pre-registered, seeded audit of DAPO on Qwen2.5-Math-7B. Three seeds of the unmodified baseline, read out at 128 samples per problem on AIME 2024 and 2025 pooled, span 1.96 points with a standard deviation of 0.99; across thirteen single-seed runs the rank correlation between the two AIME years is −0.03. Against that unit, we built nine variants: token-level credit-assignment methods that reweight advantages by pivotality, add contrastive step rewards, or importance-weight positions by future influence, and a prompt selector driven by a tracked difficulty estimate; none is individually distinguishable from the baseline under its three-seed prediction interval, and the modified-recipe runs sit on average about 1.5 points below it. A KL-targeted step-size controller, holding each variant at the baseline's late-phase KL, does not recover the largest harm, from high-amplification reweighting. The positive finding concerns the rollout budget: the 75% of prompts that DAPO's dynamic sampling discards are mostly surplus truncated once the training batch is filled; under a trained policy the mixed-group rate is 60–76%, far above the 25% implied by the discard statistic. Halving the generation batch trains the same 64 groups per step at half the rollouts and 24% less wall-clock, with a pooled accuracy difference of −0.18 points over three seeds each, inside the seed standard deviation on both sides.",
+ "license": {
+ "metadata": "CC0-1.0",
+ "abstract": "CC0-1.0"
+ }
+}