potentialpaper

Deadline-Constrained Dynamic Workflow Scheduling Can be Cast as a Representation Learning Problem

Import NeurIPS 2026 submission cMnAOzk1N3: 10 notes

@openreview[bot] · 2026-11-22 17:58 UTC · 1bd8df585f07

Evidence

.gitattributes added

+++ b/.gitattributes
@@ -0,0 +1,10 @@
+# PDFs and pictures are kept with Git LFS (https://git-lfs.com). With it installed (`git lfs install`),
+# a clone has the files, and `git add` of one stores a pointer. This file is the same on every page.
+/.potentialpaper/*.pdf filter=lfs diff=lfs merge=lfs -text
+/versions/*.pdf filter=lfs diff=lfs merge=lfs -text
+/thumbnail.png filter=lfs diff=lfs merge=lfs -text
+/thumbnail.jpg filter=lfs diff=lfs merge=lfs -text
+/thumbnail.jpeg filter=lfs diff=lfs merge=lfs -text
+/thumbnail.gif filter=lfs diff=lfs merge=lfs -text
+/thumbnail.webp filter=lfs diff=lfs merge=lfs -text
+/thumbnail.avif filter=lfs diff=lfs merge=lfs -text

.potentialpaper/metadata.json added

+++ b/.potentialpaper/metadata.json
@@ -0,0 +1,24 @@
+{
+ "layout": 5,
+ "identifiers": [
+ {
+ "scheme": "openreview",
+ "value": "cMnAOzk1N3"
+ }
+ ],
+ "title": "Deadline-Constrained Dynamic Workflow Scheduling Can be Cast as a Representation Learning Problem",
+ "authors": [
+ "Ya Shen",
+ "Gang Chen",
+ "Hui Ma",
+ "Mengjie Zhang"
+ ],
+ "abstract": "Deadline-Constrained Cost-Aware Dynamic Workflow Scheduling (D-CADWS) aims to minimize virtual machine (VM) rental cost while maintaining high workflow deadline satisfaction in dynamic cloud environments. The problem is challenging because the deadline impact of assigning a workflow task to a VM is not directly observable at decision time. It depends on long-horizon effects, including downstream task dependencies, VM queueing, and interactions among dynamically arriving workflows. Existing methods usually fold deadline violations into a single reward or penalty term, which obscures the distinction between action safety and action cost. In this paper, we cast D-CADWS as a representation learning problem. The core idea is to learn a deadline-aware representation that can predict, before execution, whether a candidate action is risky with respect to the current task deadline, and then use it to guide cost-efficient scheduling. Based on this idea, we propose a representation-centered deep reinforcement learning (RCDRL) method. RCDRL constructs task-level deadline supervision, trains a predictive deadline model to learn deadline-aware representations, and learns a VM-cost critic on top of this representation. The final policy follows a safe-first rule that rejects risky actions before minimizing VM cost. We further propose a two-phase training strategy to keep the learned representation aligned with the evolving policy-induced data distribution. Experiments on dynamic workflow scheduling benchmarks show that RCDRL can reduce VM rental cost while maintaining strong deadline success.",
+ "year": 2026,
+ "venue": "NeurIPS 2026",
+ "source": "openreview",
+ "license": {
+ "metadata": "CC0-1.0",
+ "abstract": "CC0-1.0"
+ }
+}

community/10-tl-dr.md added

+++ b/community/10-tl-dr.md

community/20-summary.md added

+++ b/community/20-summary.md

community/30-why-it-matters.md added

+++ b/community/30-why-it-matters.md

community/40-critique.md added

+++ b/community/40-critique.md

community/50-errata.md added

+++ b/community/50-errata.md

community/60-reproductions.md added

+++ b/community/60-reproductions.md

community/70-follow-ups.md added

+++ b/community/70-follow-ups.md

owners/10-tl-dr.md added

+++ b/owners/10-tl-dr.md

owners/20-overview.md added

+++ b/owners/20-overview.md

owners/30-results.md added

+++ b/owners/30-results.md

owners/40-demos.md added

+++ b/owners/40-demos.md

owners/50-code-and-data.md added

+++ b/owners/50-code-and-data.md

owners/60-talks.md added

+++ b/owners/60-talks.md

prek.toml added

+++ b/prek.toml
@@ -0,0 +1,36 @@
+# Checks run before each commit, with prek (https://prek.j178.dev): `prek install` once in this clone.
+# The site checks every push again; these catch mistakes before you commit. The same on every page.
+
+[[repos]]
+repo = "builtin"
+hooks = [
+ { id = "check-json" },
+ { id = "pretty-format-json", args = ["--autofix", "--no-sort-keys", "--no-ensure-ascii"], exclude = '^demos/' },
+ { id = "end-of-file-fixer", exclude = '^demos/' },
+ { id = "trailing-whitespace", args = ["--markdown-linebreak-ext=md"], exclude = '^demos/' },
+ { id = "check-case-conflict" },
+ { id = "check-illegal-windows-names" },
+ { id = "check-added-large-files", args = ["--maxkb=256"], exclude = '^demos/' },
+]
+
+# Each JSON file against its schema (https://papers.potentialhedge.com/schemas/).
+[[repos]]
+repo = "https://github.com/python-jsonschema/check-jsonschema"
+rev = "0.39.0"
+hooks = [
+ { id = "check-jsonschema", name = "author section plugins files", files = '^owners/plugins\.json$', args = ["--schemafile", "https://papers.potentialhedge.com/schemas/authorPlugins.json"] },
+ { id = "check-jsonschema", name = "venue files", files = '^venue\.json$', args = ["--schemafile", "https://papers.potentialhedge.com/schemas/venue.json"] },
+ { id = "check-jsonschema", name = "topic files", files = '^topic\.json$', args = ["--schemafile", "https://papers.potentialhedge.com/schemas/topic.json"] },
+ { id = "check-jsonschema", name = "organisation files", files = '^org\.json$', args = ["--schemafile", "https://papers.potentialhedge.com/schemas/org.json"] },
+ { id = "check-jsonschema", name = "link files", files = '^links/[^/]+\.json$', args = ["--schemafile", "https://papers.potentialhedge.com/schemas/link.json"] },
+ { id = "check-jsonschema", name = "version files", files = '^versions/[^/]+\.json$', args = ["--schemafile", "https://papers.potentialhedge.com/schemas/version.json"] },
+ { id = "check-jsonschema", name = "picture files", files = '^thumbnail\.json$', args = ["--schemafile", "https://papers.potentialhedge.com/schemas/thumbnail.json"] },
+]
+
+# Sections formatted the way the web editor formats them.
+[[repos]]
+repo = "https://github.com/rbubley/mirrors-prettier"
+rev = "v3.9.9"
+hooks = [
+ { id = "prettier", files = '^(owners|community)/.*\.md$' },
+]

reviews/openreview/cmnaozk1n3/forms.json added

+++ b/reviews/openreview/cmnaozk1n3/forms.json
@@ -0,0 +1,227 @@
+{
+ "schema": "forms/1",
+ "forms": {
+ "Meta_Review": {
+ "label": "Meta-review",
+ "fields": [
+ {
+ "key": "metareview",
+ "label": "Meta-review",
+ "type": "text"
+ }
+ ]
+ },
+ "Decision": {
+ "label": "Decision",
+ "fields": [
+ {
+ "key": "title",
+ "label": "Title",
+ "hidden": true
+ },
+ {
+ "key": "decision",
+ "label": "Decision",
+ "type": "choice"
+ },
+ {
+ "key": "comment",
+ "label": "Comment",
+ "type": "text"
+ },
+ {
+ "key": "metareview",
+ "label": "Meta-review",
+ "type": "text"
+ },
+ {
+ "key": "final_justification",
+ "label": "Final justification",
+ "type": "text"
+ }
+ ]
+ },
+ "Official_Comment": {
+ "label": "Comment",
+ "fields": [
+ {
+ "key": "title",
+ "label": "Title",
+ "type": "choice"
+ },
+ {
+ "key": "comment",
+ "label": "Comment",
+ "type": "text"
+ }
+ ]
+ },
+ "Public_Comment": {
+ "label": "Public comment",
+ "fields": [
+ {
+ "key": "title",
+ "label": "Title",
+ "type": "choice"
+ },
+ {
+ "key": "comment",
+ "label": "Comment",
+ "type": "text"
+ }
+ ]
+ },
+ "Withdrawal": {
+ "label": "Withdrawal",
+ "fields": [
+ {
+ "key": "withdrawal_confirmation",
+ "label": "Confirmation",
+ "hidden": true
+ }
+ ]
+ },
+ "Desk_Rejection": {
+ "label": "Desk rejection",
+ "fields": [
+ {
+ "key": "desk_reject_comments",
+ "label": "Reason",
+ "type": "text"
+ }
+ ]
+ },
+ "Official_Review": {
+ "label": "Official review",
+ "summary": [
+ "rating",
+ "confidence",
+ "quality",
+ "clarity",
+ "significance",
+ "originality"
+ ],
+ "fields": [
+ {
+ "key": "rating",
+ "label": "Rating",
+ "type": "score",
+ "min": 1,
+ "max": 6
+ },
+ {
+ "key": "confidence",
+ "label": "Confidence",
+ "type": "score",
+ "min": 1,
+ "max": 5
+ },
+ {
+ "key": "quality",
+ "label": "Quality",
+ "type": "score",
+ "min": 1,
+ "max": 4
+ },
+ {
+ "key": "clarity",
+ "label": "Clarity",
+ "type": "score",
+ "min": 1,
+ "max": 4
+ },
+ {
+ "key": "significance",
+ "label": "Significance",
+ "type": "score",
+ "min": 1,
+ "max": 4
+ },
+ {
+ "key": "originality",
+ "label": "Originality",
+ "type": "score",
+ "min": 1,
+ "max": 4
+ },
+ {
+ "key": "contribution_type",
+ "label": "Contribution type",
+ "type": "choice"
+ },
+ {
+ "key": "summary",
+ "label": "Summary",
+ "type": "text"
+ },
+ {
+ "key": "strengths_and_weaknesses",
+ "label": "Strengths and weaknesses",
+ "type": "text"
+ },
+ {
+ "key": "questions",
+ "label": "Questions",
+ "type": "text"
+ },
+ {
+ "key": "limitations",
+ "label": "Limitations",
+ "type": "text"
+ },
+ {
+ "key": "final_justification",
+ "label": "Final justification",
+ "type": "text"
+ },
+ {
+ "key": "paper_formatting_concerns",
+ "label": "Formatting concerns",
+ "type": "text"
+ },
+ {
+ "key": "ethical_concerns",
+ "label": "Ethical concerns",
+ "type": "choice"
+ },
+ {
+ "key": "code_of_conduct_acknowledgement",
+ "label": "Code of conduct",
+ "hidden": true
+ },
+ {
+ "key": "responsible_reviewing_acknowledgement",
+ "label": "Responsible reviewing",
+ "hidden": true
+ }
+ ]
+ },
+ "Rebuttal": {
+ "label": "Rebuttal",
+ "fields": [
+ {
+ "key": "rebuttal",
+ "label": "Rebuttal",
+ "type": "text"
+ }
+ ]
+ },
+ "Ethics_Review": {
+ "label": "Ethics review",
+ "fields": [
+ {
+ "key": "scope_of_ethics_concerns",
+ "label": "Scope",
+ "type": "choice"
+ },
+ {
+ "key": "ethics_review",
+ "label": "Ethics review",
+ "type": "text"
+ }
+ ]
+ }
+ },
+ "url": "https://openreview.net/group?id=NeurIPS.cc%2F2026%2FConference",
+ "license": "CC-BY-4.0"
+}

reviews/openreview/cmnaozk1n3/notes/52wzaocoi4.json added

+++ b/reviews/openreview/cmnaozk1n3/notes/52wzaocoi4.json
@@ -0,0 +1,31 @@
+{
+ "schema": "review/1",
+ "id": "52WZaoCoI4",
+ "replyTo": null,
+ "kind": "review",
+ "invitation": "Official_Review",
+ "signature": "Reviewer TJFk",
+ "content": {
+ "summary": "This paper addresses deadline-constrained cost aware dynamic workflow scheduling, where the goal is to minimise VM rental cost subject to a deadline miss rate tolerance. The authors argue that existing DRL schedulers fail this objective by encoding deadline compliance as a scalar penalty, which conflates safety with cost minimisation. The proposed method, RCDRL, learns a task-encoder supervised with task-level deadline targets derived by propagating workflow deadlines down the DAG. At inference time, a safe-first policy filters out high-risk scheduling actions before the cost critic selects among the remainder. Encoder and cost critic are trained in alternating phases to prevent representation corruption. The paper also introduces the DCCS@τ metric, which counts cost savings only when the deadline gap stays within τ, and evaluates on three workflow-size settings against heuristic and DRL baselines. RCDRL is the only method achieving nonzero DCCS@10%.",
+ "contribution_type": "general",
+ "strengths_and_weaknesses": "### Strengths\n\n- The DCCS metric correctly reflects the constrained objective by conditioning cost savings on deadline compliance. Table 1 makes the failure of prior methods on this metric evident, heuristics and DRL baselines all have deadline gaps well above 10% despite saving more absolute cost.\n\n- Propagating the workflow deadline down the DAG to produce task level lateness targets is a principled way to generate dense per-step supervision from a delayed, workflow-level signal.\n\n- The ablation in Table 2 cleanly isolates each design choice. Removing deadline filtering produces exactly the failure mode the method is designed to prevent, and every result is directionally consistent with its design motivation.\n- The two phase training structure is clearly motivated and confirmed by the ablation: freezing the encoder before TD training prevents the cost critic from overwriting the deadline-aware representation.\n\n### Weaknesses\n\n- There is no comparison against any constrained RL baseline. Lagrangian relaxation, constrained policy optimization, and primal-dual approaches are the natural comparisons for Equation 3's constrained objective, and without them it is unclear whether the representation learning framing is necessary.\n\n- All three DRL baselines were designed for unconstrained or softly constrained scheduling, not the hard-constraint objective being evaluated, and all share authorship with the proposed method. The comparison is against methods that were not built to solve this problem.\n\n- Practical cost savings raise the question of whether a learned system justifies deployment over a simpler deadline-enforcing heuristic, which the paper does not address.\n\n- The risk threshold and fallback ratio are fixed across all experiments with no sensitivity analysis, leaving the full safety-cost tradeoff unexplored.",
+ "quality": 3,
+ "clarity": 3,
+ "significance": 3,
+ "originality": 2,
+ "questions": "1. How does RCDRL compare against a Lagrangian relaxation baseline with an adaptive penalty coefficient? To me, this is the most natural comparison, if you think otherwise, I am open other comparison(s).\n\n2. What is the sensitivity of DCCS@10% to the risk threshold? Is there a setting where relaxing it gives substantially more cost saving while staying within tolerance?\n\n3. How exactly are task deadlines assigned to intermediate (non-exit) DAG nodes? The sufficient-condition property is described but the specific per-node assignment rule is not clear from the main text.\n\n4. Does two phase training converge faster or more stably than joint training across multiple seeds, or does it only affect final performance?",
+ "limitations": "yes",
+ "rating": 4,
+ "confidence": 3,
+ "ethical_concerns": [
+ "NO or VERY MINOR ethics concerns only"
+ ],
+ "paper_formatting_concerns": "None",
+ "code_of_conduct_acknowledgement": "Yes",
+ "responsible_reviewing_acknowledgement": "Yes"
+ },
+ "createdAt": "2026-06-25T23:22:52.495Z",
+ "modifiedAt": "2026-11-18T13:36:53.875Z",
+ "url": "https://openreview.net/forum?id=cMnAOzk1N3&noteId=52WZaoCoI4",
+ "license": "CC-BY-4.0"
+}

reviews/openreview/cmnaozk1n3/notes/fcasflb0vj.json added

+++ b/reviews/openreview/cmnaozk1n3/notes/fcasflb0vj.json
@@ -0,0 +1,15 @@
+{
+ "schema": "review/1",
+ "id": "fcasfLb0vj",
+ "replyTo": "52WZaoCoI4",
+ "kind": "comment",
+ "invitation": "Rebuttal",
+ "signature": "Authors",
+ "content": {
+ "rebuttal": "We thank the reviewer for highlighting five concerns: constrained baselines, parameter sensitivity, learning versus direct filtering, task-level supervision, and training reliability. We address each concerns below.\n\n## **Key Concern 1: Does RCDRL outperform constraint-tuned RL baselines? (Weaknesses 1-2; Question 1)**\n\n**Yes. Under the same DCCS@10% criterion, RCDRL is feasible on all three problem scales and achieves the lowest VM cost among all feasible methods.**\n\nAs requested, we compare against four constrained baselines:\n\n- **Penalty-tuned DRL** [1]: PPO with a fixed, validation-tuned deadline penalty.\n- **Adaptive Lagrangian** [2]: RCPO-style PPO with an adaptive multiplier.\n- **CPO** [3]: constrained policy updates using a KL trust region.\n- **Primal-dual** [4]: natural-gradient policy and projected dual updates.\n\nThese methods handle deadline violations through scalarization or trajectory-level constrained optimization. RCDRL instead learns action-level deadline risk, filters risky actions, and minimizes long-term cost among the remaining actions.\n\nAll methods use the same simulator, training and test instances, interaction budget, random seeds, and validation method. We retain each baseline’s constraint-handling mechanism while adapting it to the D-CADWS action space.\n\n| Method | S: Success / Cost | M: Success / Cost | L: Success / Cost | Feasible Scales |\n|---|---:|---:|---:|---:|\n| Penalty-tuned DRL [1] | 0.861 / 548.6 | 0.868 / 972.4 | 0.848 / 2085.3 | 0/3 |\n| Adaptive Lagrangian [2] | 0.872 / 612.1 | 0.883 / 1090.4 | 0.862 / 2256.4 | 3/3 |\n| CPO [3] | 0.884 / 628.8 | 0.899 / 1125.6 | 0.875 / 2278.9 | 3/3 |\n| Primal-dual [4] | 0.869 / 603.5 | 0.878 / 1078.2 | 0.856 / 2237.1 | 3/3 |\n| **RCDRL** | **0.870 / 582.8** | **0.890 / 1023.9** | **0.860 / 2184.2** | **3/3** |\n\nHere, feasibility means satisfying DCCS@10%. Penalty-tuned DRL achieves lower cost but is infeasible on every scale. Among methods feasible on all three scales, Primal-dual is the lowest-cost competitor. RCDRL achieves higher success than Primal-dual while reducing VM cost by **20.7, 54.3, and 52.9**—equivalent to **3.4%, 5.0%, and 2.4%**—on S, M, and L.\n\n**In summary, under the same deadline criterion, RCDRL achieves the lowest VM cost among all tested methods that remain feasible across all three problem scales**.\n\n[1] Schulman et al., *Proximal Policy Optimization Algorithms*, 2017. \n[2] Tessler et al., *Reward Constrained Policy Optimization*, ICLR 2019. \n[3] Achiam et al., *Constrained Policy Optimization*, ICML 2017. \n[4] Ding et al., *Natural Policy Gradient Primal-Dual Method for CMDPs*, NeurIPS 2020.\n\n## **Key Concern 2: How sensitive is RCDRL to the risk threshold and fallback ratio? (Weakness 4; Question 2)**\n\n**RCDRL shows a clear safety–cost trade-off, driven mainly by the risk threshold $\\delta$; $\\rho$ matters less because it is used only when no action passes the threshold. The setting $\\delta=\\rho=0.2$ used in all main experiments achieves the highest cost saving among the tested values while guaranteeing feasibility on S, M, and L.**\n\nThe threshold $\\delta$ determines which actions are considered low risk. If no action passes this threshold, $\\rho$ determines the fraction of lowest-risk actions retained. Increasing either value admits more actions and can reduce cost, but may lower deadline success.\n\n### Risk-threshold sensitivity ($\\rho=0.2$)\n\n| $\\delta$ | Avg. Success | Avg. Cost Saving | Feasible Scales |\n|---:|---:|---:|---:|\n| 0.05 | 0.903 | 0.057 | 3/3 |\n| 0.10 | 0.892 | 0.075 | 3/3 |\n| **0.20** | **0.873** | **0.099** | **3/3** |\n| 0.30 | 0.858 | 0.118 | 1/3 |\n| 0.40 | 0.838 | 0.139 | 0/3 |\n| 0.50 | 0.811 | 0.165 | 0/3 |\n\nAs $\\delta$ increases from 0.05 to 0.50, average cost saving rises from 0.057 to 0.165, while success falls from 0.903 to 0.811. Values above 0.2 lose feasibility on at least two problem scales.\n\n### Fallback-ratio sensitivity ($\\delta=0.2$)\n\n| $\\rho$ | Avg. Success | Avg. Cost Saving | Feasible Scales |\n|---:|---:|---:|---:|\n| 0.10 | 0.879 | 0.091 | 3/3 |\n| **0.20** | **0.873** | **0.099** | **3/3** |\n| 0.30 | 0.870 | 0.102 | 2/3 |\n| 0.40 | 0.866 | 0.106 | 1/3 |\n| 0.50 | 0.861 | 0.111 | 0/3 |\n\nChanging $\\rho$ has a smaller effect than changing $\\delta$, but values above 0.2 make RCDRL infeasible on at least one scale.\n\nHere, averages are taken across S, M, and L, and feasibility means satisfying DCCS@10%. The results support using one common setting rather than tuning the parameters separately for each test scale. **Our defult setting $\\delta=\\rho=0.2$ was the best trade-off among all testing scales**.\n\n## **Key Concern 3: Does RCDRL justify its inference overhead over a direct deadline heuristic? (Weakness 3)**\n\n**Yes. Compared with the direct heuristic, RCDRL reduces VM cost by 4.0%–10.2% while remaining feasible under DCCS@10%. At the largest tested action set, this requires only 3.60 ms of additional inference time per decision.**\n\nThe **Direct target + immediate price** heuristic filters actions using the analytical task-deadline rule and then selects the VM with the lowest immediate price. It uses neither a learned deadline representation nor a long-term cost critic.\n\n| Policy | S: Success / Cost | M: Success / Cost | L: Success / Cost |\n|---|---:|---:|---:|\n| Direct target + immediate price | 0.882 / 628.5 | 0.902 / 1140.2 | 0.873 / 2274.8 |\n| **RCDRL** | **0.870 / 582.8** | **0.890 / 1023.9** | **0.860 / 2184.2** |\n\nRCDRL lowers VM cost by **45.7, 116.3, and 90.6**, equivalent to **7.3%, 10.2%, and 4.0%**, on S, M, and L. Success decreases by only **1.2–1.3 percentage points**, and all three scales remain feasible. This shows that **learning long-term cost produces meaningful savings beyond selecting the cheapest available VM**.\n\nWe also measure policy-only inference time as the number of candidate actions increases:\n\n| Candidate Actions | Direct Rule (ms) | RCDRL (ms) | Added Time (ms) |\n|---:|---:|---:|---:|\n| 10 | 0.05 | 0.42 | 0.37 |\n| 20 | 0.07 | 0.63 | 0.56 |\n| 50 | 0.13 | 1.22 | 1.09 |\n| 100 | 0.25 | 2.15 | 1.90 |\n| 200 | 0.48 | 4.08 | 3.60 |\n\nRCDRL’s inference time grows approximately linearly and remains below 5 ms even with 200 candidate actions. **Thus, at most 3.60 ms of additional inference time delivers 4.0%–10.2% lower VM cost while preserving DCCS@10%, demonstrating a substantial practical gain for a small computational overhead**.\n\n## **Key Concern 4: How exactly are intermediate task deadlines constructed? (Question 3)**\n\n**Intermediate task deadlines are computed deterministically by allocating the workflow deadline budget according to each task’s progress along the fastest-VM critical path. Exit tasks receive the workflow deadline, while upstream tasks receive earlier deadlines.**\n\nFor workflow and task indices, define the deadline budget, fastest-VM execution time, and longest remaining fastest-VM path as\n$$\nD\\_i=d\\_i-a\\_i,\n\\qquad\ne\\_{ij}=ET\\_{\\mathrm{fast}}(O\\_{ij}),\n\\qquad\nr\\_u(O\\_{ij})=\\text{longest remaining fastest-VM path from }O\\_{ij}.\n$$\n\nThe workflow’s fastest-VM critical-path length is\n$R\\_i=\\max\\_j r\\_u(O\\_{ij}).$\nWe assign the task deadline as\n\n$$\nd^{\\mathrm{task}}\\_{ij}=a\\_i+D\\_i\\frac{R\\_i-r\\_u(O\\_{ij})+e\\_{ij}}{R\\_i}.\n$$\n\nThe fraction above measures the task’s completion progress along the critical path. For an exit task,\n$r\\_u(O\\_{ij})=e\\_{ij},$\nand hence $d^{\\mathrm{task}}\\_{ij}=d\\_i.$ Because\n$r\\_u(O\\_{ij})\\geq e\\_{ij},$ every intermediate task deadline is no later than the workflow deadline. Therefore, meeting all assigned task deadlines is sufficient for meeting the workflow deadline.\n\nFor each candidate VM, we estimate the task finish time as\n\n$$\n\\widehat{FT}\\_{ij,m}=\\max\\\\{t,AT(m)\\\\}+ET(O\\_{ij},m).\n$$\n\nWe then compute normalized lateness and its bounded supervision target:\n\n$$\n\\ell\\_{ij,m}=\\frac{\\max\\\\left(0,\\widehat{FT}\\_{ij,m}-d^{\\mathrm{task}}\\_{ij}\\right)}{\\max\\\\left(d^{\\mathrm{task}}\\_{ij}-t,\\epsilon\\right)},\\qquad y\\_{ij,m}=\\frac{\\ell\\_{ij,m}}{1+\\ell\\_{ij,m}}.\n$$\n\nThe target is zero when the candidate VM completes the task on time and increases with normalized lateness. Different VM availability times and execution speeds therefore produce different targets for the same task. **This construction converts the workflow deadline into dense action-level supervision signals linked to the remaining DAG path. RCDRL uses this signal to identify deadline risk, while the separate TD critic estimates long-term VM cost**.\n\n## **Key Concern 5: Does two-phase training converge faster and more reliably than joint training? (Question 4)**\n\n**Yes**. Under the same architecture, data, seeds, and evaluation protocol, **two-phase training reaches the common target earlier, has lower cross-seed variability, and succeeds for every seed**.\n\nWe keep all settings fixed and compare only two-phase training with joint end-to-end training. The metric in the table measures the number of outer iterations required to reach the predefined target of 95% feasible performance (will be explicitly clarified in the revision). \n\n| Training | Iterations to 95% feasible performance | Success std. | Feasible seeds |\n|---|---:|---:|---:|\n| **Two-phase** | **$620\\pm55$** | **0.009** | **10/10** |\n| Joint end-to-end | $850\\pm96$ | 0.022 | 7/10 |\n\nBased on the table, two-phase training reaches the target 230 iterations earlier, i.e., requiring $(850-620)/850=27.1\\%$ fewer iterations than joint training. It also reduces success standard deviation from 0.022 to 0.009 and increases the number of feasible runs from 7/10 to 10/10. **Therefore, two-phase training reaches the target with 27.1% fewer iterations, reduces success variability, and achieves feasibility in all 10 runs, demonstrating faster and more reliable performance than joint training.** \n\n**Finally**, we appreciate the reviewer’s constructive comments, which have helped us improve both the presentation and empirical validation of our work."
+ },
+ "createdAt": "2026-07-28T10:38:40.690Z",
+ "modifiedAt": "2026-11-18T17:12:30.470Z",
+ "url": "https://openreview.net/forum?id=cMnAOzk1N3&noteId=fcasfLb0vj",
+ "license": "CC-BY-4.0"
+}

reviews/openreview/cmnaozk1n3/notes/i77bby3zzc.json added

+++ b/reviews/openreview/cmnaozk1n3/notes/i77bby3zzc.json
@@ -0,0 +1,31 @@
+{
+ "schema": "review/1",
+ "id": "i77bBY3zZc",
+ "replyTo": null,
+ "kind": "review",
+ "invitation": "Official_Review",
+ "signature": "Reviewer 7E4V",
+ "content": {
+ "summary": "This paper introduces a problem called Deadline-Constrained Cost-Aware Dynamic Workflow Scheduling, abbreviated as D-CADWS. The objective is to minimize virtual machine rental cost while maintaining high workflow deadline satification in dynamic cloud environments. The authors model this as a representation learning problem. They develop a RL algorithm to train a predictive model that learns deadline-aware representations. They also learn a VM-cost critic to estimate future VM rental costs. They evaluate their approach against other deep RL methods on datasets that were previously used for Cost-Aware Dynamic Workflow Scheduling.",
+ "contribution_type": "general",
+ "strengths_and_weaknesses": "Strengths:\n1. Dynamic workflow scheduling is an interesting problem to study\n2. Builds upon previous work in this area\n3. Their approach, RCDRL, shows higher performance on success\n\nWeaknesses:\n1. Motivation for this paper is unclear -- a) why do we want to focus on the D-CADWS problem rather than focusing on scheduling in general? b) why should this problem be modeled as representation learning problem?\n2. Is each stage in the approach necessary? If so, can we show ablation results to understand the impact of each stage?\n3. Presentation of results is ambiguous -- a) what does it mean by \"The table should be read in a constraint-first way\"? , b) Figure 2 is confusing, why don't we present it simply as the trade-off between success and cost saving?",
+ "quality": 2,
+ "clarity": 2,
+ "significance": 3,
+ "originality": 2,
+ "questions": "1. Why must D-CADWS be a representation learning problem?\n2. Can this approach be generalized beyond VM-rental cost minimization?\n3. Can we evaluate the trade-off between cost saving and success more cleanly? A single metric or some combination of the two metrics.",
+ "limitations": "limitations are mentioned very briefly in the appendix. there should be more limitations on whether the approach can generlize to other applications or other scheduling problems.",
+ "rating": 3,
+ "confidence": 3,
+ "ethical_concerns": [
+ "NO or VERY MINOR ethics concerns only"
+ ],
+ "paper_formatting_concerns": "N/A",
+ "code_of_conduct_acknowledgement": "Yes",
+ "responsible_reviewing_acknowledgement": "Yes"
+ },
+ "createdAt": "2026-06-05T15:46:36.510Z",
+ "modifiedAt": "2026-11-18T13:36:58.727Z",
+ "url": "https://openreview.net/forum?id=cMnAOzk1N3&noteId=i77bBY3zZc",
+ "license": "CC-BY-4.0"
+}

reviews/openreview/cmnaozk1n3/notes/ijsrayhwpl.json added

+++ b/reviews/openreview/cmnaozk1n3/notes/ijsrayhwpl.json
@@ -0,0 +1,19 @@
+{
+ "schema": "review/1",
+ "id": "IjSrAYHWPl",
+ "replyTo": null,
+ "kind": "decision",
+ "invitation": "Decision",
+ "signature": "Program Chairs",
+ "content": {
+ "title": "Paper Decision",
+ "decision": "Accept (poster)",
+ "comment": "",
+ "metareview": "This paper addresses scheduling dynamically arriving DAG-structured workflows onto cloud VMs to minimize rental cost while keeping deadline misses below a tolerance. They reframe the problem as representation learning by using a decoder-aware encoder, a WM-cost critic learned on top of the representations, a safe-first policy, and 2-phase alternating training that keeps the representation aligned.\n\nOverall I think there is a possibility that paper can be improved here. According to the reviewers, the problem decomposition is clear, and the task-level deadline supervision is a strong contribution. However, there are nearly uniform concerns regarding missing contained / RL baselines and evaluation gaps. I think it would also be good to see more discussion w.r.t. the motivation / positioning, as well as other issues reviewers surfaced.",
+ "final_justification": "Many of the key concerns mentioned were addressed with additional experimentation and data, so I think the paper has sufficiently passed the threshold to acceptance. There are lingering concerns, so I strongly suggest the authors sufficiently bound their advertised contributions in the final draft to reflect the reviewers' final assessments."
+ },
+ "createdAt": "2026-09-24T11:18:01.916Z",
+ "modifiedAt": "2026-11-18T14:53:25.302Z",
+ "url": "https://openreview.net/forum?id=cMnAOzk1N3&noteId=IjSrAYHWPl",
+ "license": "CC-BY-4.0"
+}

reviews/openreview/cmnaozk1n3/notes/kwq7u4ckqm.json added

+++ b/reviews/openreview/cmnaozk1n3/notes/kwq7u4ckqm.json
@@ -0,0 +1,31 @@
+{
+ "schema": "review/1",
+ "id": "kWq7u4ckqM",
+ "replyTo": null,
+ "kind": "review",
+ "invitation": "Official_Review",
+ "signature": "Reviewer wpP3",
+ "content": {
+ "summary": "This paper studies deadline-constrained cost-aware dynamic workflow scheduling in cloud environments. The goal is to minimize virtual machine rental cost while maintaining a high workflow deadline success rate, rather than combining cost and deadline violations into a single scalar reward. The proposed method, RCDRL, learns an action-conditioned deadline-aware representation. A predictive deadline model estimates task-level deadline risk for each candidate VM assignment, and a VM-cost critic estimates future rental cost on top of the learned representation. The final policy follows a safe-first rule: it filters candidate actions predicted to be deadline-risky and then selects the lowest-cost action among the remaining candidates. The paper evaluates the method on dynamic workflow scheduling benchmarks with multiple workflow sizes and compares it against heuristic and DRL baselines, reporting that RCDRL is the only method with nonzero strict deadline-constrained cost saving across all tested sizes.",
+ "contribution_type": "general",
+ "strengths_and_weaknesses": "The main strength of the paper is that it clearly identifies a meaningful mismatch in many cost-aware workflow scheduling formulations: deadline violations are often folded into a scalar reward, even though in practice deadline satisfaction is closer to a constraint than an ordinary cost term. The proposed decomposition into deadline-risk estimation followed by cost minimization is intuitive and well aligned with the stated constrained scheduling objective. The paper is also generally well written. The figures and equations make the high-level RCDRL pipeline understandable, and the ablation study usefully separates the effects of the task-level target, two-phase training, and safe-first filtering.\n\nHowever, I have several major concerns about the technical strength of the submission. The most important issue is that the proposed task-level deadline supervision appears to be based on a locally computed finish-time estimate relative to a derived task deadline. This raises the question of whether the method is truly learning long-horizon deadline consequences, as claimed, or mostly learning a local sub-deadline heuristic that may already be computable from known scheduling quantities. The paper motivates the method by saying that deadline consequences depend on downstream dependencies, queueing, and dynamically arriving workflows, but the supervision target seems much more local. The paper would be substantially stronger if it explained why this target captures the intended long-horizon effects and compared against a direct non-learning baseline that simply filters actions using the same task-deadline calculation.\n\nA second major concern is the evaluation design. The main comparison is against methods that either strongly prioritize deadline success at very high cost or methods that save much more cost while missing many deadlines. This supports the qualitative point that scalarized or cost-driven policies can violate deadlines, but it does not establish that RCDRL is the best method for the constrained optimization problem. A fairer comparison would include Pareto-front or budget/constraint-tuned versions of the baselines, such as scalarized DRL methods with tuned penalty weights, Lagrangian/constrained RL baselines, and heuristic variants adjusted to match RCDRL's deadline success. Without such comparisons, it is hard to know whether RCDRL's advantage comes from the representation-learning formulation or simply from using a stronger safety filter and a conservative operating point.\n\nA third concern is reproducibility. Important details seem insufficiently specified, especially the exact task-deadline decomposition procedure, neural architecture, optimizer settings, training budgets, hyperparameter selection, risk threshold selection, and sensitivity to the threshold. The appendix gives useful simulator details, VM types, workflow patterns, and evaluation protocol, but the method cannot be reproduced confidently from the current description. The reported experiments also lack error bars or statistical significance tests, despite using a relatively small number of fixed test instances.\n\nIn terms of significance, the problem is relevant and the safe-first framing is potentially useful for scheduling and constrained decision-making. Still, the empirical evidence currently supports a narrower conclusion than the paper claims. The results show that the proposed policy can trade off deadline success and VM cost in the tested simulator, but they do not yet convincingly show that casting the problem as representation learning is necessary, broadly generalizable, or superior to simpler constrained scheduling approaches.\n\nIn terms of originality, the separation of deadline-risk estimation and cost estimation is a reasonable and potentially useful design. That said, the paper should better position the method relative to constrained RL, safe RL, action shielding, feasibility classifiers, and Lagrangian methods. The current originality claim may be overstated unless the authors can show that existing constrained/safe RL formulations are unsuitable here and that the proposed representation-learning view yields benefits beyond a learned local feasibility filter.",
+ "quality": 2,
+ "clarity": 3,
+ "significance": 3,
+ "originality": 3,
+ "questions": "1. How exactly are task deadlines computed from workflow deadlines? The appendix states the sufficient-condition interpretation of task deadlines, but I could not find a fully specified algorithm for assigning each task deadline. This is central to the method, since the learned supervision target depends on it. A precise formula or pseudocode would be needed for reproducibility.\n\n2. What happens if one removes learning from the deadline-risk model and directly filters actions using the same estimated finish time and task deadline used to construct the target? This baseline would help determine whether RCDRL learns useful representations beyond a local sub-deadline rule. My score would increase if RCDRL clearly outperformed such a direct heuristic at matched deadline success.\n\n3. Can the authors compare against constraint-tuned baselines rather than only fixed baselines? For example, scalarized DRL baselines with tuned deadline penalties, Lagrangian/constrained RL, or heuristic methods tuned to match RCDRL's success rate would clarify whether the proposed method improves the cost-success Pareto frontier. My evaluation would decrease if RCDRL's gains disappear when baselines are tuned to the same deadline tolerance.\n\n4. How sensitive is performance to the risk threshold, fallback ratio, task-deadline decomposition, and deadline tightness distribution? Since the method depends heavily on the safe-first threshold, a sensitivity analysis would help establish robustness. A plot showing cost and success as a function of the threshold would be particularly useful.\n\n5. Can the authors report variance or confidence intervals over test instances and random seeds? The differences in cost saving, especially for the large workflow setting, are relatively modest. Error bars and statistical tests would make the empirical claims much more credible.",
+ "limitations": "No. The paper briefly mentions future work on generalization across broader workload distributions and adaptive deadline-risk control, but it does not adequately discuss several important limitations. The authors should explicitly acknowledge that the approach depends on the quality of task-deadline decomposition, the chosen risk threshold, the simulator assumptions, and the availability of accurate task duration and VM availability estimates. They should also discuss the absence of formal constraint-satisfaction guarantees, the limited workload distribution used in evaluation, and the possibility that the learned risk model may not generalize to different arrival rates, VM pricing models, workflow structures, or deadline regimes.",
+ "rating": 3,
+ "confidence": 3,
+ "ethical_concerns": [
+ "NO or VERY MINOR ethics concerns only"
+ ],
+ "paper_formatting_concerns": "No violations were found.",
+ "code_of_conduct_acknowledgement": "Yes",
+ "responsible_reviewing_acknowledgement": "Yes"
+ },
+ "createdAt": "2026-06-24T08:54:17.555Z",
+ "modifiedAt": "2026-11-18T13:36:55.469Z",
+ "url": "https://openreview.net/forum?id=cMnAOzk1N3&noteId=kWq7u4ckqM",
+ "license": "CC-BY-4.0"
+}

reviews/openreview/cmnaozk1n3/notes/mnswmwkxgf.json added

+++ b/reviews/openreview/cmnaozk1n3/notes/mnswmwkxgf.json
@@ -0,0 +1,15 @@
+{
+ "schema": "review/1",
+ "id": "MnswMWKxGf",
+ "replyTo": "i77bBY3zZc",
+ "kind": "comment",
+ "invitation": "Rebuttal",
+ "signature": "Authors",
+ "content": {
+ "rebuttal": "We thank the reviewer for asking us to strengthen the motivation, isolate each stage’s contribution, clarify the deadline–cost trade-off, and discuss extensibility and generalization. We address all of the weaknesses, questions, and limitations under four concerns.\n\n## **Key Concern 1: Is representation learning a useful formulation for D-CADWS? (Weakness 1; Question 1)**\n\n**D-CADWS is well suited to a representation-learning formulation because its global workflow constraint must be translated into deadline implications for individual state–action pairs before execution.** The CMDP in Eq. (3) defines what must be optimized, while the learned representation provides the action-level information needed for constraint-first decisions.\n\nThis formulation offers three advantages:\n\n1. **Grounded constraint localization.** Task deadlines convert delayed workflow outcomes into locally sufficient conditions: meeting all task deadlines guarantees workflow deadline satisfaction. Thus, the learned deadline-aware representation \\(z(s,a)\\) provides a principled link between action-level risk and global constraint satisfaction.\n\n2. **Dense credit assignment.** Standard constrained RL primarily relies on sparse workflow- or trajectory-level violation feedback. RCDRL provides supervision at each task–VM decision, encouraging the representation to retain action-specific deadline slack, DAG, queueing, and VM information, shortening the constraint credit-assignment path.\n\n3. **Explicit constraint-first decisions.** Unlike Lagrangian methods that combine cost and violations through a multiplier, RCDRL first filters risky actions and then minimizes cost among the remaining safe action choices. Its two-phase training preserves deadline-relevant features during cost-critic learning.\n\nWe further evaluated this formulation against four constrained-RL adaptations under identical settings and the same DCCS@10% feasibility criterion:\n\n| Method | S: Success / Cost | M: Success / Cost | L: Success / Cost | Feasible |\n|---|---:|---:|---:|---:|\n| Penalty-tuned PPO [1] | 0.861 / 548.6 | 0.868 / 972.4 | 0.848 / 2085.3 | 0/3 |\n| Adaptive Lagrangian [2] | 0.872 / 612.1 | 0.883 / 1090.4 | 0.862 / 2256.4 | 3/3 |\n| CPO [3] | 0.884 / 628.8 | 0.899 / 1125.6 | 0.875 / 2278.9 | 3/3 |\n| Primal-dual [4] | 0.869 / 603.5 | 0.878 / 1078.2 | 0.856 / 2237.1 | 3/3 |\n| **RCDRL** | **0.870 / 582.8** | **0.890 / 1023.9** | **0.860 / 2184.2** | **3/3** |\n\nPenalty-tuned PPO achieves lower cost but is infeasible on every scale. Among methods feasible on all three scales, RCDRL has the lowest cost. It also dominates the lowest-cost feasible competitor, Primal-dual, achieving higher success while reducing cost by **3.4%, 5.0%, and 2.4%** on S, M, and L.\n\n**Therefore, representation learning turns delayed deadline feedback into action-level risk estimates, allowing the DWS scheduler to effectively avoid risky VM assignments before minimizing cost**.\n\n[1] Schulman et al., *Proximal Policy Optimization Algorithms*, 2017. \n[2] Tessler et al., *Reward Constrained Policy Optimization*, ICLR 2019. \n[3] Achiam et al., *Constrained Policy Optimization*, ICML 2017. \n[4] Ding et al., *Natural Policy Gradient Primal-Dual Method for CMDPs*, NeurIPS 2020.\n\n## **Key Concern 2: Are all stages of RCDRL necessary? (Weakness 2; Question 2)**\n\n**Yes. Our new ablations isolate the contributions of deadline-supervised representation learning, long-term cost estimation, and two-phase training.**\n\nWe compare Full RCDRL with four variants:\n\n- **Direct target + immediate price:** directly filters actions using estimated task finish times, then selects the VM with the lowest immediate price.\n- **Direct target + generic critic:** uses the same direct filter, followed by a cost critic without deadline-supervised features.\n- **Direct target + TD-only encoder:** trains the encoder only through the cost TD loss.\n- **Learned risk + immediate price:** uses the learned risk filter but selects the VM with the lowest immediate price, without a cost-to-go critic.\n\n| Variant | S: Success / Cost | M: Success / Cost | L: Success / Cost |\n|---|---:|---:|---:|\n| Direct target + immediate price | 0.882 / 628.5 | 0.902 / 1140.2 | 0.873 / 2274.8 |\n| Direct target + generic critic | 0.874 / 611.6 | 0.889 / 1088.7 | 0.861 / 2248.9 |\n| Direct target + TD-only encoder | 0.871 / 604.9 | 0.885 / 1075.8 | 0.857 / 2239.4 |\n| Learned risk + immediate price | 0.886 / 619.8 | 0.904 / 1110.6 | 0.876 / 2260.2 |\n| **Full RCDRL** | **0.870 / 582.8** | **0.890 / 1023.9** | **0.860 / 2184.2** |\n\nAll variants satisfy DCCS@10%, making their costs directly comparable. Full RCDRL achieves the lowest cost on every scale. Compared with Direct target + immediate price, it reduces cost by **7.3%, 10.2%, and 4.0%** on S, M, and L. The other variants remain 22.1–86.7 more expensive, showing that **both deadline-supervised features and long-term cost estimation contribute to cost reduction**.\n\nWe also compare two-phase and joint training across the same ten seeds and identical training budgets:\n\n| Training | Iterations to target | Success std. | Feasible seeds |\n|---|---:|---:|---:|\n| **Two-phase** | **$620 \\pm 55$** | **0.009** | **10/10** |\n| Joint end-to-end | $850 \\pm 96$| 0.022 | 7/10 |\n\nTwo-phase training uses **27.1% fewer iterations**, reduces variation across seeds, and increases feasible runs from 7/10 to 10/10. **These results show that each component makes a distinct contribution: deadline supervision learns risk-relevant representations, the TD critic enables long-term cost savings, and two-phase training improves convergence and reliability**.\n\n## **Key Concern 3: Can the deadline-success and VM-cost trade-off be read directly? (Weakness 3; Questions 3 and 5)**\n\n**Yes**. We report absolute workflow Success and VM Cost as mean $\\pm$ standard deviation over 10 independent runs. D-Gap and C-Saving show comparison with FASTEST-NEW-VM, and DCCS@10% indicates whether the common 10% deadline-gap criterion is met.\n\nTo provide a clear view of absolute performance within the rebuttal space limit, we report RCDRL’s detailed results below. In the revised manuscript, we will expand the main-results table to include absolute metrics, mean $\\pm$ standard deviation, and paired significance tests for all methods.\n\n| Setting | Success | VM Cost | D-Gap | C-Saving | DCCS@10% |\n|---|---:|---:|---:|---:|---:|\n| S | $0.870\\pm0.009$ | $582.8\\pm8.7$ | 0.094 | 0.107 | 0.107 |\n| M | $0.890\\pm0.008$ | $1023.9\\pm14.3$ | 0.079 | 0.144 | 0.144 |\n| L | $0.860\\pm0.010$ | $2184.2\\pm23.8$ | 0.092 | 0.045 | 0.045 |\n\nSuccess is 0.870/0.890/0.860 and VM Cost is 582.8/1023.9/2184.2 on S/M/L. All D-Gaps are below 0.10 (0.094/0.079/0.092), while cost savings remain positive (0.107/0.144/0.045). Across 10 runs, success std. is 0.008--0.010 and cost std. is 8.7--23.8. **Therefore, RCDRL makes the deadline–cost trade-off explicit by satisfying DCCS@10% while retaining positive cost savings across S, M, and L. We will also report absolute Success and VM Cost as mean $\\pm$ standard deviation in the revised paper.**\n\n## **Key Concern 4: Can RCDRL extend beyond VM cost, and what generalization is currently supported? (Question 4; Limitation)**\n\n**Yes**. Deadline satisfaction is the primary constraint, whereas VM cost is handled by a separate objective critic. The deadline-aware representation and safe-first action filtering can therefore be retained while replacing the VM-cost critic with a critic for energy, reliability, or another operational objective, provided that the objective can be evaluated at the action level. **This modular extension is possible for our future study by learning deadline risk and the secondary objective separately rather than combining them in a single reward.**\n\nThe current evidence demonstrates generalization within the studied D-CADWS setting across four scientific workflow families, three problem scales, and controlled workload shifts. Transferring to other unrelated domains is beyond the scope of our current study. By varying the workflow arrival intensity, we observe the following generalization performance:\n\n| Arrival rate $\\lambda$ | Avg. D-Gap | Avg. Cost Saving | DCCS@10% feasible |\n|---:|---:|---:|---:|\n| 0.005 | 0.079 | 0.121 | Yes |\n| 0.010 | 0.088 | 0.099 | Yes |\n| 0.020 | 0.097 | 0.061 | Yes |\n\nAs the arrival rate quadruples from 0.005 to 0.020, D-Gap increases from 0.079 to 0.097 but remains below 0.10, while cost savings decline from 0.121 to 0.061 but remain positive. This shows that RCDRL preserves the deadline requirement by reducing cost-savings under high contention. **Therefore, RCDRL can be extended beyond VM cost by replacing the objective critic. The current experimental evidence demonstrates generalization across the tested workflow families, scales, and arrival-rate shifts.** \n\n**Finally**, we are grateful for the reviewer’s constructive feedback, which has strengthened the paper’s clarity and experimental support. If the main concerns are resolved, we would appreciate a reconsideration of the rating."
+ },
+ "createdAt": "2026-07-28T10:00:25.375Z",
+ "modifiedAt": "2026-11-18T17:12:31.304Z",
+ "url": "https://openreview.net/forum?id=cMnAOzk1N3&noteId=MnswMWKxGf",
+ "license": "CC-BY-4.0"
+}

reviews/openreview/cmnaozk1n3/notes/myagaquv8h.json added

+++ b/reviews/openreview/cmnaozk1n3/notes/myagaquv8h.json
@@ -0,0 +1,15 @@
+{
+ "schema": "review/1",
+ "id": "mYAGaQUv8h",
+ "replyTo": "kWq7u4ckqM",
+ "kind": "comment",
+ "invitation": "Rebuttal",
+ "signature": "Authors",
+ "content": {
+ "rebuttal": "We thank the reviewer for questioning whether RCDRL learns beyond the analytical task-deadline rule and for requesting stronger comparisons, reproducibility, robustness, statistical validation, and appropriately scoped claims. We address these questions organized into five concerns.\n\n## **Key Concern 1: Does RCDRL learn more than the direct task-deadline filtering? (W1; W5-local-filter; Q1-Q2)**\n\n**Yes. Direct filtering provides a local deadline check, whereas RCDRL uses the same task deadlines to learn risk-relevant features and a separate critic to estimate long-term VM cost. Our new ablations show that this learned combination reduces cost while preserving DCCS@10%.**\n\n### Task-deadline construction\n\nFor workflow and task indices, define the deadline budget, fastest-VM execution time, longest remaining fastest-VM path, and critical-path length as\n$$\nD\\_i=d\\_i-a\\_i,\\qquad e\\_{ij}=ET_{\\mathrm{fast}}(O\\_{ij}),\\qquad r\\_u(O\\_{ij})=\\text{longest remaining fastest-VM path from }O\\_{ij}, \\qquad R\\_i=\\max\\_j r\\_u(O\\_{ij}).\n$$\nThe task deadline is\n$$\nd^{\\mathrm{task}}\\_{ij}=a\\_i+D\\_i\\frac{R\\_i-r\\_u(O\\_{ij})+e\\_{ij}}{R\\_i}.\n$$\n\nThis assigns earlier deadlines to upstream tasks. For an exit task,\n$r\\_u(O\\_{ij})=e\\_{ij},$ so $d^{\\mathrm{task}}\\_{ij}=d\\_i.$ For each candidate VM, we compute\n\n$$\n\\widehat{FT}\\_{ij,m}=\\max\\\\{t,AT(m)\\\\}+ET(O\\_{ij},m),\n$$\n\nfollowed by\n$$\n\\ell\\_{ij,m}=\\frac{\\max\\\\left(0,\\widehat{FT}\\_{ij,m}-d^{\\mathrm{task}}\\_{ij}\\right)}{\\max\\\\left(d^{\\mathrm{task}}\\_{ij}-t,\\epsilon\\right)},\\qquad y\\_{ij,m}=\\frac{\\ell\\_{ij,m}}{1+\\ell\\_{ij,m}}.\n$$\n\nThe target is zero for predicted on-time completion and increases with normalized lateness. This analytical target can filter locally risky actions, but by itself it does not learn reusable deadline features or estimate long-term VM cost.\n\n### Does learning improve on the direct rule?\n\nWe compare Full RCDRL with four variants:\n\n- **Direct target + immediate price:** applies the analytical filter and selects the VM with the lowest immediate price.\n- **Direct target + generic critic:** applies the same filter and uses a cost critic without deadline-supervised features.\n- **Direct target + TD-only encoder:** trains the encoder only through cost TD updates.\n- **Learned risk + immediate price:** uses the learned risk filter without a cost-to-go critic.\n\n| Variant | S: Success / Cost | M: Success / Cost | L: Success / Cost |\n|---|---:|---:|---:|\n| Direct target + immediate price | 0.882 / 628.5 | 0.902 / 1140.2 | 0.873 / 2274.8 |\n| Direct target + generic critic | 0.874 / 611.6 | 0.889 / 1088.7 | 0.861 / 2248.9 |\n| Direct target + TD-only encoder | 0.871 / 604.9 | 0.885 / 1075.8 | 0.857 / 2239.4 |\n| Learned risk + immediate price | 0.886 / 619.8 | 0.904 / 1110.6 | 0.876 / 2260.2 |\n| **Full RCDRL** | **0.870 / 582.8** | **0.890 / 1023.9** | **0.860 / 2184.2** |\n\nAll variants satisfy DCCS@10%, so their costs are directly comparable. Relative to Direct target + immediate price, Full RCDRL reduces cost by **7.3%, 10.2%, and 4.0%** on S, M, and L. It is also less expensive than every partial variant.\n\n**These results show that the direct deadline rule is useful but insufficient. Deadline supervision learns risk-relevant features, while the TD critic uses those features to make non-myopic cost decisions**.\n\n## **Key Concern 2: Does RCDRL remain better when baselines are tuned to the same deadline criterion? (W2; W4-W5-comparison; Q3)**\n\n**Yes. When every method is tuned to minimize cost subject to DCCS@10%, RCDRL achieves the lowest cost among methods that remain feasible on all three problem scales.**\n\nWe compare RCDRL with Penalty-tuned PPO [1], Adaptive Lagrangian/RCPO [2], CPO [3], and Primal-dual/NPG-PD [4]. These baselines cover fixed penalties, adaptive multipliers, constrained policy updates, and primal-dual optimization. All methods use the same simulator, data instances, interaction budget, random seeds, and validation method. Test instances are used only for final evaluation.\n\n| Method | S: Success / Cost | M: Success / Cost | L: Success / Cost | Feasible Scales |\n|---|---:|---:|---:|---:|\n| Penalty-tuned PPO [1] | 0.861 / 548.6 | 0.868 / 972.4 | 0.848 / 2085.3 | 0/3 |\n| Adaptive Lagrangian [2] | 0.872 / 612.1 | 0.883 / 1090.4 | 0.862 / 2256.4 | 3/3 |\n| CPO [3] | 0.884 / 628.8 | 0.899 / 1125.6 | 0.875 / 2278.9 | 3/3 |\n| Primal-dual [4] | 0.869 / 603.5 | 0.878 / 1078.2 | 0.856 / 2237.1 | 3/3 |\n| **RCDRL** | **0.870 / 582.8** | **0.890 / 1023.9** | **0.860 / 2184.2** | **3/3** |\n\nPenalty-tuned PPO is cheaper but fails the deadline criterion on every problem scale. Among methods feasible on all three scales, Primal-dual is the lowest-cost competitor. RCDRL dominates it by achieving both higher success and lower cost on S, M, and L, reducing cost by **3.4%, 5.0%, and 2.4%**, respectively.\n\n**Thus, RCDRL’s advantage is not due to comparisons with untuned or unconstrained baselines. It remains the lowest-cost feasible method under the same deadline criterion and experimental budget**.\n\n[1] Schulman et al., *Proximal Policy Optimization Algorithms*, 2017. \n[2] Tessler et al., *Reward Constrained Policy Optimization*, ICLR 2019. \n[3] Achiam et al., *Constrained Policy Optimization*, ICML 2017. \n[4] Ding et al., *Natural Policy Gradient Primal-Dual Method for CMDPs*, NeurIPS 2020.\n\n## **Key Concern 3: Are the implementation details complete, and are the policy parameters robust? (W3-implementation; Q4-parameters)**\n\n### **Implementation details:**\n\n**Yes**. We agree that the main paper should provide more implementation details. **Our submission includes supplementary materials containing the complete RCDRL code and the configurations required to reproduce the reported experiments**. Nevertheless, important details, such as the policy/critic architectures and optimization settings, will be **described in more detail in the revised paper**. \n\n### **Parameters robust:**\n\n**One shared parameter setting $\\delta=\\rho=0.2$ is used in all main experiments and is not tuned separately for S, M, or L. This setting was selected as the highest-cost-saving setting while ensuring feasibility on all three problem scales.**\n\nSpecifically, the risk threshold determines which actions are considered low risk. If no action passes this threshold, the fallback ratio determines the fraction of lowest-risk actions retained. Larger values admit more actions and may reduce cost, but can lower deadline success.\n\n### Risk-threshold sensitivity ($\\rho=0.2$)\n\n| Risk Threshold | Avg. Success | Avg. Cost Saving | Feasible Scales |\n|---:|---:|---:|---:|\n| 0.05 | 0.903 | 0.057 | 3/3 |\n| 0.10 | 0.892 | 0.075 | 3/3 |\n| **0.20** | **0.873** | **0.099** | **3/3** |\n| 0.30 | 0.858 | 0.118 | 1/3 |\n| 0.40 | 0.838 | 0.139 | 0/3 |\n| 0.50 | 0.811 | 0.165 | 0/3 |\n\nIncreasing the risk threshold raises cost saving but reduces deadline success. Among the tested values, 0.2 provides the greatest cost saving while remaining feasible on all three scales.\n\n### Fallback-ratio sensitivity ($\\delta=0.2$)\n\n| Fallback Ratio | Avg. Success | Avg. Cost Saving | Feasible Scales |\n|---:|---:|---:|---:|\n| 0.10 | 0.879 | 0.091 | 3/3 |\n| **0.20** | **0.873** | **0.099** | **3/3** |\n| 0.30 | 0.870 | 0.102 | 2/3 |\n| 0.40 | 0.866 | 0.106 | 1/3 |\n| 0.50 | 0.861 | 0.111 | 0/3 |\n\nChanging the fallback ratio has a smaller effect because it is used only when no action passes the risk threshold. However, values above 0.2 make RCDRL infeasible on at least one problem scale.\n\nAverages are taken across S, M, and L, and feasibility means satisfying DCCS@10%. **These results support using the shared setting $\\delta=\\rho=0.2$, rather than tuning the parameters separately for each test scale**.\n\n## **Key Concern 4: Are the results robust to task-deadline choices and statistically reliable? (W3-statistics; Q4-robustness; Q5)**\n\n**Yes. Across three alternative task-deadline allocations, average success changes by at most 0.012 and cost saving by at most 0.008 relative to the default. Across tight, mixed, and relaxed deadline distributions, D-Gap remains below 0.10. Over 10 independent runs, success standard deviation is at most 0.010 and VM-cost standard deviation is at most 1.5% of the mean.**\n\n### Task-deadline allocation\n\n| Allocation | Avg. Success | Avg. Cost Saving |\n|---|---:|---:|\n| **Upward-rank default** | **0.873** | **0.099** |\n| Equal-depth | 0.861 | 0.091 |\n| Runtime-proportional | 0.866 | 0.094 |\n| Critical-path-slack | 0.870 | 0.096 |\n\nAll three alternatives produce results close to the default. This shows that RCDRL is not tied to one specific allocation rule, although the upward-rank allocation performs best among those tested.\n\n### Deadline distribution\n\n| Distribution | D-Gap | Avg. Cost Saving |\n|---|---:|---:|\n| Tight | 0.096 | 0.052 |\n| **Mixed default** | **0.088** | **0.099** |\n| Relaxed | 0.074 | 0.154 |\n\nRCDRL remains feasible under all three distributions. As expected, tighter deadlines reduce the available cost savings, while relaxed deadlines allow greater savings.\n\n### Statistical reliability\n\nWe report mean ± standard deviation over 10 independent runs:\n\n| Setting | Success | VM Cost | D-Gap | C-Saving | DCCS@10% |\n|---|---:|---:|---:|---:|---:|\n| S | 0.870 ± 0.009 | 582.8 ± 8.7 | 0.094 | 0.107 | 0.107 |\n| M | 0.890 ± 0.008 | 1023.9 ± 14.3 | 0.079 | 0.144 | 0.144 |\n| L | 0.860 ± 0.010 | 2184.2 ± 23.8 | 0.092 | 0.045 | 0.045 |\n\nThe small run-to-run variation supports the reliability of the reported results. The corresponding variability and paired significance tests for all compared methods will be added into the revised paper.\n\n**Finally**, we sincerely thank the reviewer for the constructive feedback, which has helped us improve the paper’s clarity and strengthen its empirical support. We hope that our responses have adequately addressed the main concerns and would be grateful if the reviewer could reconsider their rating."
+ },
+ "createdAt": "2026-07-28T10:28:54.036Z",
+ "modifiedAt": "2026-11-18T17:12:30.445Z",
+ "url": "https://openreview.net/forum?id=cMnAOzk1N3&noteId=mYAGaQUv8h",
+ "license": "CC-BY-4.0"
+}

reviews/openreview/cmnaozk1n3/notes/pnlumyfdvq.json added

+++ b/reviews/openreview/cmnaozk1n3/notes/pnlumyfdvq.json
@@ -0,0 +1,15 @@
+{
+ "schema": "review/1",
+ "id": "PnluMYFdvQ",
+ "replyTo": null,
+ "kind": "meta_review",
+ "invitation": "Meta_Review",
+ "signature": "Area Chair q5bA",
+ "content": {
+ "metareview": "This paper addresses scheduling dynamically arriving DAG-structured workflows onto cloud VMs to minimize rental cost while keeping deadline misses below a tolerance. They reframe the problem as representation learning by using a decoder-aware encoder, a WM-cost critic learned on top of the representations, a safe-first policy, and 2-phase alternating training that keeps the representation aligned.\n\nOverall I think there is a possibility that paper can be improved here. According to the reviewers, the problem decomposition is clear, and the task-level deadline supervision is a strong contribution. However, there are nearly uniform concerns regarding missing contained / RL baselines and evaluation gaps. I think it would also be good to see more discussion w.r.t. the motivation / positioning, as well as other issues reviewers surfaced."
+ },
+ "createdAt": "2026-07-24T12:23:12.412Z",
+ "modifiedAt": "2026-11-18T15:19:38.996Z",
+ "url": "https://openreview.net/forum?id=cMnAOzk1N3&noteId=PnluMYFdvQ",
+ "license": "CC-BY-4.0"
+}

reviews/openreview/cmnaozk1n3/notes/t9k0qpq0ko.json added

+++ b/reviews/openreview/cmnaozk1n3/notes/t9k0qpq0ko.json
@@ -0,0 +1,15 @@
+{
+ "schema": "review/1",
+ "id": "T9K0qpq0Ko",
+ "replyTo": "vYlcNDpCmk",
+ "kind": "comment",
+ "invitation": "Rebuttal",
+ "signature": "Authors",
+ "content": {
+ "rebuttal": "We thank the reviewer for requesting absolute performance metrics, a clearer connection between Equation (3) and DCCS, comparisons with safe/constrained RL, parameter sensitivity, workload-shift robustness, and inference scaling. We organize all weaknesses and questions into the four key concerns below.\n\n## **Key Concern 1: What are RCDRL's absolute results, and how do they map to Equation (3)? (Weakness 1; Question 3)**\n\nRCDRL achieves absolute workflow success rates of **0.870, 0.890, and 0.860**, corresponding to miss rates of **0.130, 0.110, and 0.140** on S, M, and L.\n\n**DCCS@10% does not mean that at most 10% of workflows may miss their deadlines. It requires RCDRL's success rate to be at least 90% of the FASTEST-NEW-VM success rate.**\n\n### Absolute performance\n\n| Setting | Success | Miss Rate | VM Cost | D-Gap | C-Saving |\n|---|---:|---:|---:|---:|---:|\n| S | $0.870\\pm0.009$ | $0.130\\pm0.009$ | $582.8\\pm8.7$ | 0.094 | 0.107 |\n| M | $0.890\\pm0.008$ | $0.110\\pm0.008$ | $1023.9\\pm14.3$ | 0.079 | 0.144 |\n| L | $0.860\\pm0.010$ | $0.140\\pm0.010$ | $2184.2\\pm23.8$ | 0.092 | 0.045 |\n\nAll three D-Gaps are below 0.10. Therefore, RCDRL satisfies DCCS@10% and achieves positive cost savings on every scale.\n\n### Relation to Equation (3)\n\nEquation (3) requires\n\n$$\n\\mathbb{E}[M(\\tau)]\\leq\\epsilon_{\\mathrm{miss}}.\n$$\n\nFor a reference success rate $S_{\\mathrm{fast}}$, DCCS@10% requires\n\n$$\nS\\geq0.9S_{\\mathrm{fast}}.\n$$\n\nBecause the miss rate is $M=1-S$, the corresponding allowed miss rate is\n\n$$\nM\\leq1-0.9S_{\\mathrm{fast}}.\n$$\n\nThis gives the following requirements:\n\n| Setting | Reference Success | Required Success | Allowed Miss Rate | RCDRL Success |\n|---|---:|---:|---:|---:|\n| S | 0.960 | 0.864 | 0.136 | 0.870 |\n| M | 0.967 | 0.870 | 0.130 | 0.890 |\n| L | 0.947 | 0.852 | 0.148 | 0.860 |\n\nRCDRL exceeds the required success by **0.006, 0.020, and 0.008** on S, M, and L. Therefore, although its miss rates exceed 10%, RCDRL satisfies DCCS@10% because its success rates remain within 10% of the corresponding reference rates.\n\nEquation (3) introduces an absolute miss-rate limit. In our experiments, the limit for each scale is determined by requiring at least 90% of the FASTEST-NEW-VM success rate. **We will clarify this relationship, report the absolute results clearly, and include variability and paired significance tests in the revision**.\n\n## **Key Concern 2: How does RCDRL differ from safe/constrained RL, and does it win under the same constraint? (Weakness 3; Question 1)**\n\nRCDRL is closest to learned action shielding in design, but its action filter is predictive rather than guaranteed. Unlike hard shields that apply a known safety rule or external safety model, RCDRL learns task-deadline risk through dense supervised representation learning. The resulting deadline-aware representation is frozen during cost-critic updates and reused to estimate long-term VM cost.\n\nRCDRL also differs from standard constrained RL in where the constraint is handled. Constrained RL methods control trajectory-level violations through penalties, Lagrange multipliers, or constrained policy updates. RCDRL instead filters predicted high-risk actions at each decision and minimizes long-term cost among the remaining actions.\n\nWe compare RCDRL with four constrained baselines:\n\n- **Penalty-tuned DRL** [1]: PPO with a fixed, validation-tuned deadline penalty.\n- **Adaptive Lagrangian** [2]: RCPO-style PPO with an adaptive Lagrange multiplier.\n- **CPO** [3]: constrained policy updates using a KL trust region.\n- **Primal-dual** [4]: natural-policy-gradient and projected dual updates.\n\nAll methods use the same simulator, training and test instances, interaction budget, random seeds, and validation protocol. We retain each baseline's original constraint-handling mechanism while adapting its policy to the D-CADWS action space.\n\n| Method | S: Success / Cost | M: Success / Cost | L: Success / Cost | Feasible scales |\n|---|---:|---:|---:|---:|\n| Penalty-tuned DRL [1] | 0.861 / 548.6 | 0.868 / 972.4 | 0.848 / 2085.3 | 0/3 |\n| Adaptive Lagrangian [2] | 0.872 / 612.1 | 0.883 / 1090.4 | 0.862 / 2256.4 | 3/3 |\n| CPO [3] | 0.884 / 628.8 | 0.899 / 1125.6 | 0.875 / 2278.9 | 3/3 |\n| Primal-dual [4] | 0.869 / 603.5 | 0.878 / 1078.2 | 0.856 / 2237.1 | 3/3 |\n| **RCDRL** | **0.870 / 582.8** | **0.890 / 1023.9** | **0.860 / 2184.2** | **3/3** |\n\nHere, feasibility means satisfying DCCS@10%. Penalty-tuned DRL attains lower cost but falls below the feasibility threshold on every scale. Among methods feasible on all three scales, RCDRL achieves the lowest cost. Compared with the lowest-cost feasible competitor, Primal-dual, RCDRL also achieves higher success while reducing cost by **3.4%, 5.0%, and 2.4%** on S, M, and L.\n\n**In summary, RCDRL differs from standard constrained RL by learning an action-level deadline representation and using it to filter risky decisions before optimizing cost. Under the same deadline criterion, it achieves the lowest VM cost across all three problem scales**.\n\n[1] Schulman et al., *Proximal Policy Optimization Algorithms*, 2017. \n[2] Tessler et al., *Reward Constrained Policy Optimization*, ICLR 2019. \n[3] Achiam et al., *Constrained Policy Optimization*, ICML 2017. \n[4] Ding et al., *Natural Policy Gradient Primal-Dual Method for Constrained Markov Decision Processes*, NeurIPS 2020.\n\n## **Key Concern 3: How sensitive is RCDRL to the risk threshold and fallback ratio? (Weakness 2; Question 2)**\n\n**RCDRL shows a clear and expected safety–cost trade-off: larger $\\delta$ or $\\rho$ can reduce cost but also increase deadline misses. We selected $\\delta=\\rho=0.2$ once using validation instances and applied these values unchanged to S, M, and L test instances.**\n\nThe risk threshold $\\delta$ controls which actions are accepted as low risk. If no action passes this threshold, $\\rho$ controls the fraction of lowest-risk actions retained by the fallback rule. We vary one parameter at a time.\n\n### Sensitivity to $\\delta$ ($\\rho=0.2$)\n\n| $\\delta$ | Avg. Success | Avg. Cost Saving | Feasible Scales |\n|---:|---:|---:|---:|\n| 0.05 | 0.903 | 0.057 | 3/3 |\n| 0.10 | 0.892 | 0.075 | 3/3 |\n| **0.20** | **0.873** | **0.099** | **3/3** |\n| 0.30 | 0.858 | 0.118 | 1/3 |\n| 0.40 | 0.838 | 0.139 | 0/3 |\n| 0.50 | 0.811 | 0.165 | 0/3 |\n\nIncreasing $\\delta$ from 0.05 to 0.50 raises average cost saving from 0.057 to 0.165, but lowers success from 0.903 to 0.811. Among the tested values, $\\delta=0.2$ provides the largest cost saving while remaining feasible on all three problem scales.\n\n### Sensitivity to $\\rho$ ($\\delta=0.2$)\n\n| $\\rho$ | Avg. Success | Avg. Cost Saving | Feasible Scales |\n|---:|---:|---:|---:|\n| 0.10 | 0.879 | 0.091 | 3/3 |\n| **0.20** | **0.873** | **0.099** | **3/3** |\n| 0.30 | 0.870 | 0.102 | 2/3 |\n| 0.40 | 0.866 | 0.106 | 1/3 |\n| 0.50 | 0.861 | 0.111 | 0/3 |\n\nThe effect of $\\rho$ is smaller because it is used only when no action passes the risk threshold. Nevertheless, values above 0.2 lose feasibility on at least one problem scale. Among the tested values, $\\rho=0.2$ again gives the largest feasible cost saving across all three scales.\n\nHere, averages are computed across S, M, and L, and feasibility means satisfying DCCS@10%. These results show that $\\delta$ is the main control of the safety–cost trade-off, while $\\rho$ has a smaller but non-negligible effect. **Thus, the setting $\\delta=\\rho=0.2$, selected on validation data, provides the best feasible cost saving among the tested values**.\n\n## **Key Concern 4: How robust is RCDRL to arrival-rate shifts, and how does inference scale? (Questions 4-5)**\n\nRCDRL remains within DCCS@10% under all tested arrival-rate shifts without fine-tuning, while **policy latency scales approximately linearly and remains in the millisecond range.** To test robustness, we evaluate the fixed policy under different arrival rates:\n\n| Arrival rate $\\lambda$ | Avg. D-Gap | Avg. Cost Saving | DCCS@10% feasible |\n|---:|---:|---:|---:|\n| 0.005 | 0.079 | 0.121 | Yes |\n| 0.010 | 0.088 | 0.099 | Yes |\n| 0.020 | 0.097 | 0.061 | Yes |\n\nAs the arrival rate ($\\lambda$) increases from 0.005 to 0.020, D-Gap rises from 0.079 to 0.097 but remains below the 0.10 threshold, while cost savings decline from 0.121 to 0.061 but remain positive. This reflects the intended constraint-first behavior: **under high contention, RCDRL sacrifices some cost savings to preserve the deadline criterion.**\n\nAt each decision step, the candidate actions consist of all feasible task–VM pairs. The **Direct rule** filters these actions using the same analytical task-deadline calculation and then selects the currently cheapest VM. To isolate policy inference cost, we report mean policy latency at varied scales:\n\n| Candidate actions | Direct rule mean (ms) | RCDRL mean (ms) |\n|---:|---:|---:|\n| 10 | 0.05 | 0.42 |\n| 20 | 0.07 | 0.63 | \n| 50 | 0.13 | 1.22 |\n| 100 | 0.25 | 2.15 |\n| 200 | 0.48 | 4.08 |\n\nRCDRL’s mean inference time increases from 0.42 ms with 10 candidate actions to 4.08 ms with 200. Even at the largest action set, its overhead over the direct rule is only 3.60 ms. **Thus, RCDRL remains feasible under the tested fourfold arrival-rate increase, while its inference latency scales approximately linearly and remains at the millisecond level.**\n\n**Finally**, we thank the reviewer for the valuable feedback, which has helped us clarify the paper and strengthen its empirical evidence."
+ },
+ "createdAt": "2026-07-28T10:12:57.823Z",
+ "modifiedAt": "2026-11-18T17:12:30.973Z",
+ "url": "https://openreview.net/forum?id=cMnAOzk1N3&noteId=T9K0qpq0Ko",
+ "license": "CC-BY-4.0"
+}

reviews/openreview/cmnaozk1n3/notes/vylcndpcmk.json added

+++ b/reviews/openreview/cmnaozk1n3/notes/vylcndpcmk.json
@@ -0,0 +1,31 @@
+{
+ "schema": "review/1",
+ "id": "vYlcNDpCmk",
+ "replyTo": null,
+ "kind": "review",
+ "invitation": "Official_Review",
+ "signature": "Reviewer PBPb",
+ "content": {
+ "summary": "The authors propose a new problem, which they call Deadline-Constrained Cost-Aware Dynamic Workflow Scheduling, where dynamically arriving DAG-structured workflows must be assigned to cloud VMs to minimise rental cost while keeping deadline misses below a certain tolerance. The authors reframe the constraint-handling problem as representation learning rather than reward scalarisation, in which they train an encoder with task-level deadline supervision to produce a deadline-aware representation, learn a separate VM-cost critic on top of the frozen encoder, and derive a safe-first policy that filters out high-risk actions before minimising cost among the rest, using a two-phase alternating training procedure to keep the representation aligned with the evolving policy.",
+ "contribution_type": "use_inspired",
+ "strengths_and_weaknesses": "## Strengths\n* The core idea is good. Splitting safety from cost into two heads trained on a shared representation is a sensible response to a real problem with prior work.\n* The task-level deadline decomposition is the most convincing piece of the method. Workflow-level feedback only arrives at the end of an episode, which is a terrible training signal, and converting it into a dense per-action target is exactly the kind of fix that should help. \n* Figure 1 really helps to understand the whole problem/method.\n* Figure 2 communicates the cost-deadline trade-off efficiently and supports the numerical claims in Table 1.\n\n## Weaknesses\n* All metrics in Table 1 are normalized against FASTEST-NEW-VM, a reference policy with unlimited VM supply and zero queueing delay. This is a reasonable upper bound for deadline success, but the paper does not report absolute deadline success rates as a primary number. RCDRL's raw success rate should be stated directly rather than left to be inferred from the normalized Deadline Gap.\n* The risk threshold and fallback ratio are the two parameters that determine where RCDRL sits on the cost-deadline trade-off curve, yet the paper reports a single operating point per setting with no sensitivity analysis. Without this, it is not possible to assess whether the reported numbers reflect a robust property of the method or a threshold chosen to produce a favorable Table 1.\n* The related work section covers CADWS-specific heuristics and DRL methods thoroughly but does not engage with the constrained-RL or safe-RL literature (e.g., shielding, Lagrangian methods), which is the natural point of comparison for a filter-then-optimize decision rule of this kind.",
+ "quality": 3,
+ "clarity": 3,
+ "significance": 3,
+ "originality": 3,
+ "questions": "1. How does the safe-first filtering rule relate to safety-shielding or Lagrangian constrained-RL approaches?\n1. How sensitive is the cost–deadline trade-off in Table 1 to the risk threshold δ and the fallback ratio ρ, and was δ tuned per workflow-size setting? \n1. How does the 11–14% deadline miss rate relate to the tolerance ϵ_miss in Eq. (3)?\n1. Were any experiments run on a different simulator, workflow family, or arrival process, even informally or in earlier drafts? \n1. How does per-step inference cost scale with the number of candidate VMs in A(s)?",
+ "limitations": "The paper does not include a general limitations section. The only relevant material is the assumption list for FASTEST-NEW-VM (Appendix C.2) and the task/workflow deadline sufficient-condition caveat (Appendix A.2), neither of which addresses the single-simulator scope, threshold sensitivity, or scaling with VM pool size. A dedicated limitations paragraph covering these points is needed.",
+ "rating": 4,
+ "confidence": 2,
+ "ethical_concerns": [
+ "NO or VERY MINOR ethics concerns only"
+ ],
+ "paper_formatting_concerns": "No paping formatting concerns",
+ "code_of_conduct_acknowledgement": "Yes",
+ "responsible_reviewing_acknowledgement": "Yes"
+ },
+ "createdAt": "2026-06-17T16:03:38.187Z",
+ "modifiedAt": "2026-11-18T13:36:56.794Z",
+ "url": "https://openreview.net/forum?id=cMnAOzk1N3&noteId=vYlcNDpCmk",
+ "license": "CC-BY-4.0"
+}

reviews/openreview/cmnaozk1n3/submission.json added

+++ b/reviews/openreview/cmnaozk1n3/submission.json
@@ -0,0 +1,12 @@
+{
+ "schema": "submission/1",
+ "id": "cMnAOzk1N3",
+ "venue": {
+ "id": "NeurIPS.cc/2026/Conference",
+ "name": "NeurIPS 2026",
+ "url": "https://openreview.net/group?id=NeurIPS.cc%2F2026%2FConference"
+ },
+ "number": 7559,
+ "url": "https://openreview.net/forum?id=cMnAOzk1N3",
+ "license": "CC-BY-4.0"
+}

versions/v_dns4n2mk.json added

+++ b/versions/v_dns4n2mk.json
@@ -0,0 +1,22 @@
+{
+ "date": "2026-04-29",
+ "kind": "submitted",
+ "label": "NeurIPS 2026",
+ "submissions": [
+ {
+ "venue": "NeurIPS 2026",
+ "status": "accepted",
+ "decision": "Accept (poster)",
+ "number": 7559,
+ "url": "https://openreview.net/forum?id=cMnAOzk1N3",
+ "reviews": "openreview/cmnaozk1n3",
+ "evidence": [
+ "https://openreview.net/forum?id=cMnAOzk1N3"
+ ]
+ }
+ ],
+ "url": "https://openreview.net/forum?id=cMnAOzk1N3",
+ "evidence": [
+ "https://openreview.net/forum?id=cMnAOzk1N3"
+ ]
+}