potentialpaper

Cirrus: Revocable Durability Contracts for Cross-Session Memory

Anonymous authors

ICLR 2027

Edit this page

Or clone it with git

Run in a terminal:

Needs Git LFS. To push, use an API key from your profile as the password.

Or let your agent set it up

It checks and sets up everything: signing in, git, the clone, credentials and an SSH key.

Abstract. A procedure can be correct when written to an agent's memory, superseded in a later session, and still steer every query until its durable entry is withdrawn. Queries answered from that superseded memory value incur correction debt, which we operationalize as stale failure over revision-eligible targets. Cirrus (Contradiction-Informed Reversible Retention Under Sessions) makes the lifetime of each fact, preference, and procedure explicit: a durability contract binds versioned source evidence, calibrated future utility and revision risk, dependent retrieval keys, and an executable post-grant revocation predicate. A shared-candidate 2×22\times2 factorial isolates the lifecycle mechanism. With learned admission fixed, withdrawal raises delayed task success by 3.4 points and lowers stale failure from 11.9% to 5.1%; with withdrawal fixed, learned admission adds 1.7 success points over transparent rules. The complete system reaches 72.6% success, 4.2% unsupported answers, and 5.1% stale failures on 5,400 ConsolBench episodes at 15 aggregate A100 GPU-min per update window, improving success by 4.5 points over compressive memory at the same update compute. The ordering persists under procedure changes, multi-hop selective forgetting, and unlabeled conflicts: on STALE, frozen Cirrus scores 63.1% versus 56.7% for CUPMem. Durable memory therefore benefits from treating promotion as a revocable, evidence-carrying contract rather than a terminal write.

Are you an author? Claim this paper to see who's reading it, with views and other statistics, and to write about it here.

Claim this paper
How does this paper connect to your work? Write how you built on it, compared with it or reproduced it, or add a summary, a critique or errata.
Or make it interactive:
Start writing

edit · history

DateVersionSubmitted toPDFEvidence
14 Sep 2026ICLR 2027 (under review)submittedICLR 2027Desk rejectedreviews ↓[1]PDF[1]
Missing a version?

ICLR 2027

Desk rejected · OpenReview

Updated 24 Nov 2026, 17:18 UTC.

The venue hasn't published any reviews yet.

Missing a submission?

Loading the discussion…