potentialpaper

Online Change-point Detection using Foundation Probabilistic Forecasting Models

Alan Moore, Zhengyuan Zhu, Lynna Chu

NeurIPS 2026

Edit this page

Or clone it with git

Run in a terminal:

Needs Git LFS. To push, use an API key from your profile as the password.

Or let your agent set it up

It checks and sets up everything: signing in, git, the clone, credentials and an SSH key.

TL;DR. Our method bridges probabilistic forecasting foundation models and sequential change-point detection by transforming forecast quantiles into approximately Gaussian monitoring variables and calibrating CUSUM/MOSUM thresholds via parametric bootstrap.

Abstract. Online change-point detection is a fundamental problem in sequential monitoring, where the goal is to detect distributional changes in a time series as quickly as possible while controlling false alarms. We propose a general framework for online change-point detection that leverages foundation probabilistic forecasters, such as Chronos-2, which can capture complex temporal structure including trend, seasonality, heteroskedasticity, and nonlinear dependence. Our approach transforms each incoming observation relative to its predictive quantile forecast into an approximately standard Gaussian monitoring statistic, which can then be used in classical sequential detection procedures such as CUSUM and MOSUM. To reduce adaptation of the forecaster to post-change observations, we introduce a buffer between the forecasting context window and the forecast target. Because this design can induce serial dependence in the monitoring statistics, we develop a parametric bootstrap procedure to calibrate critical thresholds and control false alarms in practice. Extensive simulations across data-generating processes involving non-normality, trend, seasonality, heteroskedasticity, and autoregressive dependence show that the proposed method achieves competitive detection performance relative to benchmark procedures, while requiring no explicit specification of a parametric pre-change model.

Are you an author? Claim this paper to see who's reading it, with views and other statistics, and to write about it here.

Claim this paper
How does this paper connect to your work? Write how you built on it, compared with it or reproduced it, or add a summary, a critique or errata.
Or make it interactive:
Start writing

edit · history

DateVersionSubmitted toPDFEvidence
5 May 2026NeurIPS 2026submittedNeurIPS 2026Accept (poster)reviews ↓[1]—[1]
Missing a version?

NeurIPS 2026

Accept (poster) · 3 reviews · OpenReview

Updated 25 Nov 2026, 03:50 UTC.

Program Chairs · DecisionOpenReview ↗
Decision
Accept (poster)
Read decision
Meta-review

The paper introduces an algorithm for online change point detection that is general to any underlying probabilistic forecasting models, by converting quantile forecasts into Gaussian monitoring statics via a probit transformation. This is an efficient and elegant approach that has practical applications. The authors demonstrated strong empirical performance compared to statistical and learning-based baselines.

The main critique of the paper includes heavy reliance on the base model's calibration, scope limitation (univariate time-series, detecting single mean changes), and missing baselines. The authors have sufficiently addressed the reviewers' concerns during by adding guidance on hyperparameter selection and additional baselines. Please include these discussions and results in the main text of the next version of the paper.

Final justification

See metareview.

Area Chair Vx5C · Meta-reviewOpenReview ↗
Final justification
See metareview.
Read meta-review
Meta-review

The paper introduces an algorithm for online change point detection that is general to any underlying probabilistic forecasting models, by converting quantile forecasts into Gaussian monitoring statics via a probit transformation. This is an efficient and elegant approach that has practical applications. The authors demonstrated strong empirical performance compared to statistical and learning-based baselines.

The main critique of the paper includes heavy reliance on the base model's calibration, scope limitation (univariate time-series, detecting single mean changes), and missing baselines. The authors have sufficiently addressed the reviewers' concerns during by adding guidance on hyperparameter selection and additional baselines. Please include these discussions and results in the main text of the next version of the paper.

Reviewer Ym3UOpenReview ↗
Rating
4/6
Confidence
3/5
Quality
3/4
Clarity
2/4
Significance
3/4
Originality
3/4
Contribution type
general
Ethical concerns
NO or VERY MINOR ethics concerns only
Read review
Summary

The paper proposes a new method for detecting mean changes in univariate data based on probabilistic forecasting foundation models (PFMs). The authors propose to transform the predictive quantiles from the PFM into approximately Gaussian monitoring variables, which are then monitored using classical CUSUM and MOSUM.

Strengths and weaknesses

Strengths

-I find the idea of transforming the predictive quantiles into approximately Gaussian monitoring variables an interesting and elegant way to tackle changepoint detection.

Weaknesses

  • I find the scope of the paper slightly limited, since it focuses only on mean changes in univariate data. Extending it to at least the multivariate case would be interesting.
  • While the experiments consider a variety of data types, they only include a single changepoint in each series. I am curious how the method behaves when there is more than one changepoint in the time series.
  • I think it is bad practice to have a section on threshold calibration while deferring the actual explanation of how the threshold is set to the appendix. The authors should have made the effort to fit it into the main paper, particularly because, as written, the section only explains how the parametric bootstrap is set up and says nothing about how the threshold itself is chosen.
Questions
  • A few hyperparameters are selected without much explanation or study. Why is WW is set to nn? How sensitive is the method to the choice of k1k_1 and k2k_2?How much is the calibration affected by pmaxp_{max}?
  • Is it possible to report both the mean and standard deviation of the detection delay across trials, to see how significant the differences are?
  • It would be interesting to see shifts beyond δ/σ∈{0.5,1,1.5}\delta/\sigma \in \{0.5, 1, 1.5\}. The choices of κ1a,κ1b\kappa_{1a}, \kappa_{1b}, and κ2\kappa_{2} in the three monitoring sequences seems to try to match to these specific shift magnitudes, so I would like to see how the method behaves when the true shift falls between or outside this grid.
Limitations

yes

Final justification

The rebuttal addressed my concerns regarding hyperparameters, and impact of choices of κ1a,κ1b\kappa_{1a}, \kappa_{1b}, and κ2\kappa_{2}

Formatting concerns

N/A

3 comments
Authors · CommentOpenReview ↗

Rebuttal (Part 1)

We thank the reviewer for the thoughtful feedback, and for finding the transformation an elegant route to change-point detection. We respond to each comment point-by-point below.

Scope of paper. We agree that multivariate online change-point detection is an important and natural extension, and identify it in Section 5 as a promising direction. A rigorous treatment requires choices about joint versus marginal predictive distributions, the form of the multivariate alternative, aggregation of the resulting scores, and joint ARL control under cross-series dependence, together with a new benchmark suite; we view this as better addressed in a separate study rather than an addendum to this one.

We would like to re-frame the scope of our work. Existing online procedures are typically competitive for a specific class of pre-change behavior and degrade outside it: Yu-CUSUM assumes i.i.d. sub-Gaussian data, NPFOCuS assumes i.i.d., and OLS-MOSUM (BFastmonitor) assumes a simple season-trend pattern. Our framework diminishes this fragility, using foundation forecasters to enable classical sequential detectors to operate competitively without such rigid assumptions. Our simulation study across fifteen data-generating processes tests this notion, spanning trend, seasonality, heteroskedasticity, serial dependence, heavy tails and outliers. Our results in Tables 1-3 show PFM-CUSUM matching or outperforming each specialist baseline within its own niche while remaining robust outside it. We regard this breadth of application to a wide variety of univariate data types as outlining our contribution's substantive scope.

The current stopping time is defined as the first alarm, so the experiments evaluate detection of the first persistent mean change only. Once an alarm is raised, monitoring terminates, the same paradigm as each method we compare against. Detecting subsequent changes requires restarting the procedure after a new stable regime is identified and sufficient post-alarm history is collected, with the forecasting and threshold-calibration steps re-initialized. This is reasonable for well-separated changes, but it has not been evaluated in the present work. In particular, closely spaced changes, or a second change occurring before the first has been detected, may interact and are outside the scope of the current experiments. We will state this limitation explicitly rather than claiming validated multiple-change performance.

Bootstrap calibration explanation. We agree - this was initially due to a limitation of the main text in its current form due to space constraints. For a camera-ready revision of this work where an extra page of space is afforded, we will certainly move the discussion of parametric bootstrap calibration procedure of Appendix A.2 (specifically the variance normalization and nested bootstrap calibration outlines) directly into Section 3.5.

Choice of WW. The parameter WW limits the number of observations supplied to the PFM. We set W=nW=n so that, at the start of monitoring, the model uses all available observations preceding the kk-step buffer while the per-step context length and computational cost remain bounded as monitoring continues. Larger WW is preferable when computational cost permits, whereas too small a WW degrades the quantile forecasts and therefore detection performance. We will include a fuller discussion of practical considerations for choosing WW as well as other tuning parameters like k1k_1 and k2k_2 in the paper.

Sensitivity to k1k_1 and k2k_2. We have expanded Appendix A.4 to compare k∈{1,5,10,20,50}k\in\{1,5,10,20,50\} over δ/σ∈{0.5,0.75,1,1.5,2}\delta/\sigma\in\{0.5,0.75,1,1.5,2\} in i.i.d. standard Gaussian data to show that performance is not especially sensitive to the choice of k1k_1 or k2k_2. We refer the reviewer to our discussion of buffer horizons in Part 1 of our response to Reviewer uVNB, where the ablation setup is described, and results are presented in table format. For δ/σ=0.5\delta/\sigma =0.5, k=50k=50 performs best in terms of Dˉ\bar D and rate of missed change-points. However, for δ/σ≥1\delta/\sigma\ge 1, the differences for k≥5k \ge 5 are negligible in both Dˉ\bar D and missed-change proportion. This conveys that a choice of k1≥5k_1\ge 5 is sufficient for targeting shifts of size δ/σ≥1\delta/\sigma\ge 1; in the parallel scheme we recommend 5≤k1≤205\le k_1\le 20, a wide range. We recommend a substantially large buffer for k2k_2 such as k2=50k_2=50 to marginally improve performance for detecting smaller shifts based on these findings. However, the impact of this choice does not appear drastic, and we believe a recommendation to set k2>20k_2>20 is a reasonable rule-of-thumb to improve power for small shifts; we will add these recommendations to the paper.

Authors · CommentOpenReview ↗

Rebuttal (Part 2)

Impact of pmax⁡p_{\max}. To give additional clarity on the influence of pmax⁡p_{\max} on ARL calibration, we re-ran the Section 4.2 calibration experiment for pmax⁡∈{1,5,10}p_{\max} \in \{1,5,10 \} with (n,m)=(250,100)(n,m)=(250,100) observations of stable/validation data. We refer the reviewer to the rebuttal (Part 2) of Reviewer uVNB regarding pmax⁡p_{\max}, which explains the setup in more detail and presents the corresponding table of results. Overall choice of pmax⁡p_{\max} seems to have little impact on calibration; pmax⁡=5p_{\max}=5 and pmax⁡=10p_{\max}=10 give identical empirical ARL means and standard deviations in every setting, and pmax⁡=1p_{\max}=1 differs only slightly in mean and standard deviation of achieved ARL. Using BIC to choose pp prevents the AR(p)\text{AR}(p) bootstrap model from taking an unnecessarily large order. Choosing pmax⁡≥5p_{\max} \ge 5 is recommended in case of longer-memory dependence, with negligible downside if pp turns out to be much smaller.

Results with error estimates. We agree that uncertainty in the reported mean delays should be visible. The submitted supplementary tables contain Monte Carlo standard errors, but this was not sufficiently prominent. Because the reported estimand is the conditional mean delay Dˉ\bar D among trials detected within 200 post-change observations, the standard error directly quantifies uncertainty in Dˉ\bar D, whereas the standard deviation describes trial-to-trial dispersion. We will report Dˉ±SE(Dˉ)\bar D\pm\text{SE}(\bar D) in the main result table and add the corresponding standard deviations to the full supplementary tables, while continuing to report the missed-change percentage separately.

We re-structure Panel B of Table 1 from Section 4.1 and present results that include Dˉ±SE(Dˉ)\bar D\pm\text{SE}(\bar D) for each data type. The results show that uncertainty is small relative to several of the large reported gaps; when differences are comparable to their Monte Carlo uncertainty, we will describe the methods as performing similarly rather than asserting a meaningful ordering.

Data Type δ/σ OLS-Yu OLS-NPF OLS-MOSUM PFM-CUSUM PFM-MOSUM
S-T (Period 52) 0.5 52.1 ± 1.93 57.0 ± 2.01 48.2 ± 1.94 37.7 ± 1.48 34.7 ± 1.25
1 14.9 ± 0.45 18.4 ± 0.58 16.6 ± 0.53 12.3 ± 0.37 14.8 ± 0.30
1.5 6.7 ± 0.16 8.0 ± 0.19 9.9 ± 0.15 5.9 ± 0.17 9.9 ± 0.17
S(inc) + t₈ 0.5 124.1 ± 4.66 141.1 ± 3.94 86.3 ± 3.54 42.3 ± 1.48 38.5 ± 1.22
1 71.9 ± 1.64 87.7 ± 1.94 31.8 ± 1.12 15.6 ± 0.33 15.5 ± 0.30
1.5 30.5 ± 0.57 38.5 ± 0.71 16.0 ± 0.27 8.9 ± 0.21 9.9 ± 0.17
S-T + Het. 0.5 61.0 ± 2.18 52.3 ± 1.84 52.1 ± 2.18 33.7 ± 1.33 29.6 ± 0.94
1 20.2 ± 0.65 17.8 ± 0.56 17.1 ± 0.54 12.7 ± 0.40 14.8 ± 0.31
1.5 9.1 ± 0.20 8.8 ± 0.21 11.1 ± 0.16 6.6 ± 0.14 10.5 ± 0.16
S-T + SARIMA 0.5 65.4 ± 2.33 70.0 ± 2.50 62.7 ± 2.65 46.3 ± 2.30 39.9 ± 1.95
1 26.4 ± 1.05 28.1 ± 1.00 24.0 ± 0.96 17.6 ± 0.66 17.6 ± 0.41
1.5 10.8 ± 0.31 12.5 ± 0.39 12.6 ± 0.21 9.2 ± 0.19 11.6 ± 0.17

Range of δ/σ\delta/\sigma. Thank you for raising this point. We refer the reviewer to Appendix A.3.3 (Tables 2 and 3), which reports detection delay results for all considered data types at δ/σ∈{0.5,0.75,1,1.5,2}\delta/\sigma \in \{0.5,0.75,1,1.5,2\}. The reference values κ1a=1,κ1b=0.5\kappa_{1a}=1, \kappa_{1b}=0.5 and κ2=0.25\kappa_2=0.25 respectively target shifts of magnitude δ/σ=2,1\delta/\sigma=2,1 and 0.50.5. The values δ/σ=0.75\delta/\sigma=0.75 and δ/σ=1.5\delta/\sigma=1.5 fall between those which PFM-CUSUM's κ\kappa reference values target. Performance does not degrade for these intermediate shifts, and in many cases PFM-CUSUM is at or near best across the full grid of assessed shift magnitudes.

Importantly, the CUSUM reference values are defined on the PFM-derived score scale, not directly on the raw-data δ/σ\delta/\sigma scale. Under the idealized independent N(0,1)\mathcal{N}(0,1) score model, κ=d/2\kappa=d/2 targets a score-scale mean shift dd; thus, κ∈{0.25,0.5,1}\kappa\in\{0.25,0.5,1\} forms a multiscale grid for induced score shifts rather than being tuned to the three raw shifts displayed in the main table. Because the induced score-scale shift need not equal the raw standardized shift, none of the parallel reference values we select are necessarily optimal for considered δ/σ\delta/\sigma.


We again thank the reviewer for taking the time to review our work and provide feedback, and we hope that our responses help to clarify the points raised.

Reviewer Ym3U · CommentOpenReview ↗

I thank the authors for addressing my concerns. My issues are now fully resolved. I'll increase my score accordingly

Reviewer uVNBOpenReview ↗
Rating
4/6
Confidence
3/5
Quality
3/4
Clarity
3/4
Significance
3/4
Originality
2/4
Contribution type
general
Ethical concerns
NO or VERY MINOR ethics concerns only
Read review
Summary

This paper proposes a framework for online change-point detection by integrating foundation probabilistic forecasters (PFMs). The method converts each incoming observation relative to its predictive quantile forecast into an approximately standard Gaussian monitoring statistic, then plugged into sequential detection procedures such as widely used CUSUM and MOSUM. Here, the forecasted quantiles are interpreted as a discrete approximation to the predictive distribution, and the observation yty_t is converted into an estimated probability integral transform (PIT) value via linear interpolation. Under correct calibration, the PIT sequence should be approximately U(0,1). Applying the inverse standard normal CDF gives the ztz_t statistic, which is intended to behave approximately as a standard Gaussian statistic. This paper uses these transformed scores as inputs to standard sequential monitoring procedures such as CUSUM and MOSUM. The method runs multiple detectors in parallel on the Gaussian forecast-error streams. The short buffer stream is intended to react quickly to larger changes while the long-buffer stream is intended to accumulate evidence for smaller sustained shifts. Further to mitigate serial dependence induced by parallel sequential PFM forecasts, a parametric bootstrap procedure (AR(p)) is used.

Strengths and weaknesses

Strengths: The paper proposes an interesting way to use pretrained forecasting models for OCPD. It addresses an important problem in OCPD where standard parametric models may be misspecified for complex time series.

The methodological pipeline is generally clear, and components of the frameworks are technically well motivated. Rather than requiring the PFM itself to output a change-point probability, the method converts predictive quantiles into monitoring statistics that can be integrated with classical detectors. The PIT-based transformation is well-motivated and converts complex time-series observations into approximately Gaussian scores. Using two forecast horizons (20 & 50) is also a practical way to target different sizes of shifts. The authors also recognise that the transformed z-statistics are not independent and identically distributed Gaussian and propose a parametric bootstrap calibration to account for serial dependence and cross-correlation between monitoring streams.

While many individual components are known (PIT transformations, Gaussian conversion, CUSUM, MOSUM, bootstrap calibration), I think their combination in this PFM-based OCPD framework is novel. Empirical results are also promising and suggest that the PFM-based transformation can yield fast detection in settings where classical residual-based procedures are vulnerable to misspecification.

Weaknesses:

  1. The method depends heavily on the calibration quality of the pretrained forecasting model’s predictive quantiles. If the predictive quantiles are miscalibrated, then the PIT values may not be uniformly distributed under the null, and the transformed z-stats may not be approximately standard Gaussian. This could affect both false-alarm control and detection delay. Even though the bootstrap calibration accounts for serial dependence and cross-correlation among monitoring streams, the overall procedure still relies on the PFM producing reliable predictive distributions. The paper could be strengthened by a more systematic analysis of quantile miscalibration and its effect on the downstream detectors.

  2. There are also several heuristic components in the framework. The paper should provide clearer guidance on how buffer size k, p_max should be selected in practice.

  3. The transformed z-stats are also bounded because they are computed from a finite quantile grid, so they are not exactly Gaussian. While this may improve robustness to outliers as stated in the paper, its effect on CUSUM/ MOSUM calibration and detection power should be discussed more explicitly. The parametric bootstrap calibration relies on a relatively simple Gaussian AR approximation and may be less reliable when the stable validation period is short.

In a summary, more sensitivity analysis, calibration diagnostics, and practical guidance for parameter selection would strengthen the paper.

Questions
  1. Could authors provide PFM quantile calibration diagnostics on stable periods? This could use PIT histograms, empirical coverage of nominal prediction intervals/ reliability plots. This will help to assess whether the PIT values are close to uniform under the null, as the validity of the Gaussian z-stats depends heavily on quantile calibration.

  2. Could a practical guidance for selecting k1,k2, CUSUM reference values and pmaxp_max be given? While I acknowledge that Appendix A.4 supports k=20 over k=1, a practical guidance will strengthen the paper. It would be helpful for my evaluation if performance is stable over reasonable parameter ranges or if the authors provide a practical rule of thumb for choosing them.

  3. The boundedness may improve robustness to outliers, but it also means that the monitored statistics are deviating from standard Gaussian (as CUSUM and MOSUM are motivated by Gaussian monitoring theory), and may have weaker tail signals for large shifts. A small ablation comparing the current tail midpoint rule with a simple tail extrapolation would help determine whether boundedness mainly helps robustness or whether it also reduces detection power.

Limitations

Yes

Final justification

Thank you to the authors for providing additional experimental results and discussion. I will maintain my positve score.

Formatting concerns

N/A

3 comments
Authors · CommentOpenReview ↗

Rebuttal (Part 1)

We thank the reviewer for a constructive review, and for acknowledging the novel and practical aspects of our approach. We address each question and comment below.

Quantile miscalibration analysis. Thank you for raising this point. Reliable predictive quantiles are a key condition for the framework. To better assess predictive calibration, we conducted stable-period diagnostics for t3t_3 data, Gaussian data with 5% outlier contamination, season-trend data, and nonlinear-trend data. Each trial uses n=250n=250 stable observations, with diagnostics computed on the final 100100 stable observations. The table below reports mean empirical coverage in percent, with Monte Carlo standard errors across 1000 trials in parentheses, along with the mean and standard deviation of the transformed scores.

Data Type k 80% PI 98% PI mean(z) sd(z)
Nominal 80.0 98.0 0.000 1.000
i.i.d. t₃ 20 81.7 (0.12) 98.1 (0.04) −0.005 0.959
50 82.7 (0.14) 98.6 (0.04) −0.004 0.933
N(0,1) + outliers 20 82.5 (0.12) 98.0 (0.04) −0.007 0.953
50 83.9 (0.14) 98.4 (0.04) −0.007 0.926
S-T (Period 52) 20 82.6 (0.14) 99.4 (0.03) +0.144 0.899
50 86.9 (0.16) 99.8 (0.02) +0.199 0.804
Nonlinear trend 20 78.8 (0.14) 99.4 (0.03) +0.205 0.936
50 78.7 (0.26) 99.9 (0.02) +0.503 0.796

For the heavy-tailed and contaminated settings, coverage is close to nominal even for the 98% interval, and the transformed scores have means near zero and standard deviations near one. We observed no quantile-order violations in the reported simulations. The trend settings reveal a limitation: the 98% intervals are conservative and the scores have nonzero means and sub-unit variances, especially for the longer nonlinear-trend forecast. Thus, the PIT--probit scores are approximately, not exactly, standard Gaussian.

These departures have direct implications for the downstream detectors. Under H0H_0, a persistent bias in zt,kz_{t,k} shifts the CUSUM increments and the center of the MOSUM moving sums, which may alter the achieved ARL. Variance compression tends to make the procedures conservative. Under H1H_1, overly dispersed predictive intervals attenuate the induced change on the zz-scale and can increase detection delay.

The Section 4.2 ARL study includes season-trend data, and the delay experiments of Sections 4.1 and Appendix A.3.3 include both season-trend and nonlinear-trend data. ARL calibration is thus evaluated end-to-end for season-trend data, and detection delay is evaluated end-to-end for both of these difficult data types. However, these studies do not isolate predictive miscalibration's effects on critical threshold estimates or detection delay. We will add the above diagnostics and their downstream interpretation to the paper, and will recommend checking PIT or prediction-interval calibration on the available stable period before deployment. Material departures should prompt explicit forecast recalibration or reconsideration of the forecasting backbone or horizon, rather than relying on the bootstrap to compensate for marginal predictive miscalibration.

Buffer horizons. We expanded Appendix A.4 to compare k∈{1,5,10,20,50}k\in\{1,5,10,20,50\} over δ/σ∈{0.5,0.75,1,1.5,2}\delta/\sigma\in\{0.5,0.75,1,1.5,2\} in i.i.d. N(0,1)\mathcal{N}(0,1) data. Each experiment uses a single two-sided CUSUM with a reference value matched to the injected shift and its threshold calibrated to ARL=400\text{ARL}=400, thereby isolating kk. We set n=250n=250, τ=251\tau=251, and run 200 trials. Cells report conditional mean delay Dˉ\bar D and missed-change percentage (miss %); zeros are omitted.

δ/σ k=1 k=5 k=10 k=20 k=50
0.5 39.2 (18.0%) 38.6 (12.5%) 39.3 (9.5%) 40.5 (5.0%) 34.8 (1.5%)
0.75 22.8 (11.0%) 21.4 (3.5%) 21.8 (1.0%) 20.1 (0.5%) 19.9
1 12.1 (11.0%) 12.2 (1.5%) 13.9 (0.5%) 12.9 12.6
1.5 6.4 (5.5%) 6.2 (0.5%) 6.2 6.2 6.6
2 3.8 (5.0%) 3.6 3.7 3.7 4.0

At δ/σ=0.5\delta/\sigma=0.5 the proportion of missed changes falls as kk grows, from 18.0% at k=1k=1 to 1.5% at k=50k=50, while for δ/σ≥1\delta/\sigma\ge 1 the differences in results for k≥5k \ge 5 are negligible. This motivates setting k1=20k_1=20, k2=50k_2=50. As a rule of thumb, one should pick a short buffer 5≤k1≤205\le k_1\le 20 for moderate-to-large shifts, plus one substantially longer buffer k2>20k_2>20 for small shifts. The cost of a large buffer is potential degradation of quantile accuracy, which is why a shorter k1k_1 is needed in the parallel scheme.

Authors · CommentOpenReview ↗

Rebuttal (Part 2)

CUSUM reference values. These operate on the transformed-score scale. For independent N(0,1)\mathcal{N}(0,1) scores with post-change mean shift dd, the classical choice is κ=d/2\kappa=d/2; our values {0.25,0.5,1}\{0.25,0.5,1\} thus span approximate zz-scale shifts {0.5,1,2}\{0.5,1,2\}. A raw shift δ/σ\delta/\sigma need not induce the same zz-scale shift. If a minimum relevant shift size is known, representative shifts can be injected into held-out stable sequences to estimate the induced score drift. Otherwise, a small multiscale grid followed by joint ARL calibration avoids committing to one alternative. A thorough study of the selection of CUSUM reference values in parallel schemes depending on the anticipated range of shift sizes may be found in Zhao et al. (2005).

Choice of pmax⁡p_{\max}. To provide concrete results to inform choice of pmax⁡p_{\max}, we re-ran the Section 4.2 calibration experiment for pmax⁡∈{1,5,10}p_{\max} \in \{1,5,10\} on i.i.d. t3t_3, AR(1) and season-trend data with (n,m)=(250,100)(n,m)=(250,100) observations of stable/validation data. We ran 100100 calibration trials per setting, evaluating the resulting thresholds estimated to achieve ARL=400\text{ARL}=400 against ground-truth Monte Carlo null streams. The results are presented below in terms of the empirical ARL mean (standard deviation) of each setting:

Data Type pmax⁡=1p_{\max}=1 pmax⁡=5p_{\max}=5 pmax⁡=10p_{\max}=10
i.i.d. t₃ 576 (164) 568 (178) 568 (178)
AR(1), ρ=0.4 581 (236) 581 (241) 581 (241)
S-T (Period 52) 502 (241) 510 (249) 510 (249)

Where serial dependence is absent or short-memory as in these data types, choice of pmax⁡p_{\max} seems to have little effect: pmax⁡=5p_{\max}=5 and 1010 give identical results and pmax⁡=1p_{\max}=1 differs only slightly, achieving a mildly smaller ARL standard deviation. This is because BIC-informed order selection usually selects a reasonable order pp for the AR(p)\text{AR}(p) model even if pmax⁡p_{\max} is much larger. Setting pmax⁡≥5p_{\max}\ge 5 is recommended in case there is longer-memory serial dependence in the raw data, as this choice comes with little downside based on this ablation.

Tail extrapolation ablation. We agree that incorporating tail extrapolation is a worthwhile consideration, and we have run the suggested ablation. We compare PFM-CUSUM against an otherwise identical procedure where the midpoint tail rule is replaced by a simple Gaussian tail extrapolation, well-specified for monitoring Gaussian data. Precisely, we fit a normal distribution to the two lowermost or uppermost forecast quantiles to estimate the CDF value utu_t in the extreme tails, clipping CDF values to [10−6,1−10−6][10^{-6},1-10^{-6}] so zz-statistics are bounded in [−4.753,4.753][-4.753,4.753] rather than [−2.576,2.576][-2.576,2.576].

We assess two data types from Appendix A.3.1: i.i.d. N(0,1)\mathcal{N}(0,1) data, where the extrapolation should work well, and outlier-contaminated N(0,1)\mathcal{N}(0,1) data. Otherwise the setup matches Section 4.1: n=250n=250, τ=275\tau =275, 200200 post-change observations, 500 trials per setting, and δ/σ∈{0.5,1,1.5}\delta/\sigma\in\{0.5, 1, 1.5\}. Thresholds are calibrated per tail rule to ARL=400\text{ARL}=400 on Monte Carlo null streams. The table below reports conditional detection delay Dˉ\bar D along with the proportion of missed change-points (miss %):

Data Type δ/σ Midpoint rule Tail extrap.
i.i.d. N(0,1) 0.5 35.2 (4.1%) 35.9 (4.1%)
1 11.2 11.2
1.5 6.0 6.0
N(0,1) + outl. 0.5 25.3 (0.9%) 28.4 (1.5%)
1 8.8 10.8
1.5 5.0 6.7

On i.i.d.\ N(0,1)\mathcal{N}(0,1) data where the extrapolation is well specified, the performance of the two rules is nearly identical. Under outlier contamination the midpoint rule has lower Dˉ\bar D at every shift size, likely because extrapolated tails give occasional outliers more leverage at a fixed ARL. Thus in these cases, the extrapolation offers no gain in power while reducing robustness under contamination. We will add this ablation with a more formal outline of the tail extrapolation rule to the Appendix to motivate the tail midpoint rule.


We thank the reviewer again for providing helpful suggestions to improve the paper. Regarding originality, we agree the individual components are known; our claim of novelty is about a holistic view of the interface. Existing OCPD procedures are usually powerful for one class of data under specific assumptions, and often fail when those assumptions are broken. This paper is to our knowledge the first to combine PFM quantile forecasts with OCPD methodology, making distribution-free monitoring of data with trend, seasonality, heteroskedasticity, heavy tails and outliers and their combinations possible with a single procedure. The components of multi-horizon forecasting, PIT-probit transformation, parallel monitoring design, and dependence-aware bootstrap calibration is also new in combination and informed by our ablations.


Zhao et al. (2005, IIE Transactions 37(11), 1047–1057)

Reviewer uVNB · CommentOpenReview ↗

Thank you to the authors for providing additional experimental results and discussion. My concerns in Q2 and Q3 have been adequately addressed, and I will maintain my overall score.

Regarding Q1, it would be helpful to include a brief discussion of the 80% PI results as well, as these show larger standard errors and may provide additional insights into the method’s performance.

Reviewer DsvyOpenReview ↗
Rating
4/6
Confidence
3/5
Quality
3/4
Clarity
3/4
Significance
2/4
Originality
3/4
Contribution type
general
Ethical concerns
NO or VERY MINOR ethics concerns only
Read review
Summary

This paper proposes a generic framework for change-point detection using forecasting models. The proposed method relies on a pre-trained time series forecasting model, transforms the predicted quantiles via the probability integral transform to standard Gaussian, and finally, based on deviations from that, gives change point decisions. The generic framework can be combined, theoretically, with any change point detection algorithms; and the paper gives two of the existing change point detection algorithms as examples in numerical studies.

Strengths and weaknesses

The strengths include:

  1. The method is generic, not specific to a prediction model (so that foundation models can be used, too) and not specific to a specific change point detection approach.
  2. The numerical results do give evidence of the competitive performance of the proposed approach.
  3. The method is clearly described in the paper.

Weaknesses include:

  1. There are only two change point detection methods that are combined with the proposed framework, whereas the proposed framework is compared with other change point detection methods in numerical studies. If the proposed framework can be combined with any change-point detection method/module, why not do an apples-to-apples comparison of how the predictive model-based approach improves on top of any competing approach, both when combined with a change-point detection method and when not?
  2. The paper does not discuss computational cost of quantile fitting and the stability of quantile fitting. In real data applications, obtaining 100 quantiles simultaneously can be super computationally intensive, especially when considering the online time series setting. Further more, the stability of estimation of quantiles near 0 or 100% can be problematic with limited data. The success of the proposed framework depends on a good and stable estimation of the quantiles. This can be especially true when the time series has outliers, which present a gap between the value of the outlier and bulk data, that can totally confuse the quantile prediction. A similar scenario is the existence of anomalies, which can be ignored in quantile fitting procedure, but it might correspond to a change point.
  3. It is hard to tell the role of CHRONOS2 in the framework. How sensitive it is to the choice of the prediction model and training data?
Questions

Please see above for the weaknesses.

Limitations

See above.

Final justification

The authors' rebuttal resolved some of (but not all, especially comparisons with other methods) my comments and clarified some confusing points. I am raising my score.

Formatting concerns

na

2 comments
Authors · CommentOpenReview ↗

Rebuttal (Part 1)

We thank the reviewer for recognizing the clarity, generality, and competitive empirical performance of the proposed framework. We agree that the original presentation did not sufficiently isolate the contribution of the PFM transformation or make the computational and forecasting-backbone sensitivity results sufficiently visible. We address the reviewer's points in full below.

Apples-to-apples comparison. Thank you for this suggestion. We agree our original experiments did not fully isolate the contribution of the PFM-based transformation from the downstream detector. Because the PFM component produces monitoring scores rather than a stopping rule, it cannot by itself be evaluated using detection delay or average run length (ARL). We therefore conduct a detector-matched comparison in which the same downstream procedure is applied either to standardized raw observations or to PFM-derived monitoring scores.

We compare e-SR (one of the original baselines) as applied to observations standardized on the initial stable period against PFM-e-SR, which applies the same detector family in parallel to Chronos-2 PIT–probit scores from k1=20k_1=20 and k2=50k_2=50-step forecasts. Both stopping rules are separately calibrated by Monte Carlo simulation to ARL=400\text{ARL}=400. The simulation design matches Section 4.1: n=250n=250, a change at τ=275\tau=275, 200 post-change observations, and 500 trials per setting. Each cell below reports conditional mean detection delay, with the percentage of changes not detected within 200 post-change observations in parentheses (omitted when zero).

Data Type δ/σ PFM-e-SR e-SR
Gaussian, increasing variance 0.5 37.9 (0.6%) 78.4 (1.8%)
1 12.6 22.1
1.5 6.9 11.1
Outlier-contaminated Gaussian 0.5 25.4 93.5 (3.8%)
1 9.8 29.1
1.5 5.9 14.1
AR(1), ρ=0.4 0.5 60.2 (6.0%) 56.2 (2.8%)
1 20.2 20.6
1.5 11.1 10.1
ARMA(1,2), t₅ errors 0.5 65.3 (19.4%) 79.1 (11.2%)
1 27.8 (0.2%) 29.7
1.5 14.4 14.2

This comparison shows that the PFM transformation greatly improves on e-SR's performance for the increasing-variance or outlier-contamination data types. However, it is not uniformly beneficial, giving little to no improvement in the AR(1) setting and mixed results for ARMA$(1,2)$ data with t5t_5 innovations. We will add this ablation and sharpen our contribution accordingly: the PFM layer is a modular interface that can make complex temporal structure more amenable to standard sequential detectors, but it is not guaranteed to improve every detector in every setting.

Computational cost. To clarify, our implementation does not fit 100 separate quantile models online. Chronos-2 jointly returns 21 predictive quantiles per forecast horizon from its pretrained model. Appendix~A.6 reports the end-to-end runtime of a complete PFM-CUSUM monitoring step, including forecasting and updating the detector. On two Tesla T4 GPUs, the measured mean runtime is 100.56 ms per series and time step for one series, 22.73 ms for a batch of 10 series, and ∼\sim 17--18 ms per series and time step for batches of 50--200 series. Forecasting is the principal computational cost; we will move these facts into the main discussion rather than leaving them in the appendix.

Predictive-quantile stability. We agree that reliable predictive quantiles are an important condition for the framework. The bootstrap addresses serial and cross-stream dependence in the monitoring scores; it does not repair systematic marginal miscalibration of the PFM. We therefore conducted stable-period coverage diagnostics in two settings specifically relevant to the reviewer's concern: heavy-tailed t3t_3 data and Gaussian data with 5% outlier contamination. Each trial uses n=250n=250 stable observations, and coverage is evaluated on the final 100100 stable observations. The table below reports mean empirical coverage in percent and Monte Carlo standard errors across 10001000 trials.

Data Type k 50% PI 80% PI 98% PI
Nominal 50.0 80.0 98.0
i.i.d. t₃ 20 48.6 (0.16) 81.7 (0.12) 98.1 (0.04)
i.i.d. t₃ 50 49.4 (0.19) 82.7 (0.14) 98.6 (0.04)
Gaussian + outliers 20 47.0 (0.17) 82.5 (0.12) 98.0 (0.04)
Gaussian + outliers 50 48.2 (0.19) 83.9 (0.14) 98.4 (0.04)

Coverage is close to nominal, even for the 98% interval using 0.010.01 and 0.990.99 quantiles. We also observed no quantile-order violations across simulations reported in the paper, including the outlier-contaminated setting. These diagnostics do not imply that every PFM will be calibrated on every series; rather, they provide evidence that Chronos-2 is approximately marginally calibrated in the challenging settings evaluated here. We will recommend checking PIT or prediction-interval calibration on available stable validation data before deploying the monitoring procedure.

Authors · CommentOpenReview ↗

Rebuttal (Part 2)

Predictive-quantile stability (continued). To put a finer point on consequences of outliers or anomalies in the stable period: outliers occurring at a similar rate throughout will be anticipated by the PFM with sufficient context, and the coverage results above are computed on exactly such a setting, where the forecaster widens its predictive quantiles rather than being destabilized. A sustained, multi-observation anomaly within the stable period is different, as it leaves forecasts calibrated to a mechanism that does not describe the monitoring period (the period is not strictly "stable" in this case). This affects virtually any method calibrated on stable data, but it does mean the stable period should be screened beforehand, for which the same coverage diagnostics may also be used.

A separate issue is the distinction between a transient outlier and a persistent change at the detection stage. Our approach bounds the contribution of an extreme observation to each monitoring score at ∣zt,k∣≤2.576|z_{t,k}|\leq 2.576, limiting, but not eliminating, its influence, whereas a persistent mean change induces a sustained directional bias that accumulates in the detector. The kk-step forecasting buffer delays post-change observations from entering the forecast context by kk time steps.

We do not claim robustness to arbitrary contamination. Changes in tail behavior or outlier frequency that do not induce a persistent mean shift are challenging but interesting venues for additional exploration that are outside the current scope of this work.

The role of Chronos-2. Chronos-2 is the forecasting backbone that generates predictive quantiles; the PIT-probit transformation, buffering scheme, sequential detector, and threshold calibration are separate components. Our use of ''model-agnostic'' refers to this interface: any probabilistic forecaster that returns predictive quantiles or samples can be substituted. It does not mean that detection performance is invariant to forecasting quality.

We chose Chronos-2 because of its forecasting performance, computational efficiency, and relatively fine 21-quantile grid. Appendix~A.5 contains a controlled backbone comparison in which Chronos-2 is replaced by TimesFM-2.5 while the detector and target ARL=400\text{ARL}=400 are retained. On i.i.d. Gaussian data, PFM-CUSUM mean delays at δ/σ∈{0.5,1,1.5}\delta/\sigma\in\{0.5,1,1.5\} are (32.6,10.9,5.8)(32.6,10.9,5.8) with Chronos-2 and (39.1,12.6,6.5)(39.1,12.6,6.5) with TimesFM-2.5; the corresponding PFM-MOSUM delays are (30.1,13.4,9.5)(30.1,13.4,9.5) and (34.1,14.4,10.2)(34.1,14.4,10.2). Thus the alternative backbone remains competitive but is modestly weaker in this study. TimesFM-2.5 returns only nine default quantiles, so its coarser grid and stronger score truncation are plausible contributors, although this experiment does not isolate that mechanism.

Both models are used zero-shot, so our procedure introduces no task-specific model training. Nevertheless, performance can depend on how well a model's pretraining distribution transfers to the monitored series. We therefore do not claim invariance to the PFM or its training corpus. For the JFK application, we verified that the series was not part of the Chronos-2 pretraining corpus. More generally, stable-period calibration diagnostics provide a practical check on whether a chosen backbone is suitable for a particular monitoring problem.


We again thank the reviewer for providing constructive feedback. To briefly address our method's significance: Tables 1-3 of the paper show our approach, particularly PFM-CUSUM, matches or outperforms multiple baselines that are state-of-the-art in their respective niches, such as NPFOCuS for i.i.d. streams with unknown distribution, or OLS-MOSUM for season-trend data. Processes displaying one or a combination of heavy tails, drifting variance, outliers, seasonality and trend may be sequentially monitored with a single algorithm under our approach, a capability which, to our knowledge, is not offered by existing approaches. We hope our clarifications and additional experiments are helpful and will be taken into account.

From OpenReview, CC BY 4.0. Authors as signed there; shown unedited.

Missing a submission?

Loading the discussion…